Touch and go landing Flashcards
1.
Perform cleared for T/O items
2.
Read cleared for T/O checklist
3.
Align aircraft on rwy centerline
4.
Apply take-off power
- Throttle full forward
- RPM 2388
- Time max 5 Mins
5.
Accelerate acft and check airspeed rising and engine instruments normal
6.
Rotate at 65 KIAs, attitude approx. 8º up
7.
When positive rate of climb, smoothly apply brakes and retract the gear
- Climb with 75 KIAS
- At 500 ft/GND
- 85 KIAS
- Flap up
- Set climb power 22’’ MP and 2250 RPM
- Turn 90º left/right
- Read after T/O checklist
- At 500 ft/GND
8.
At 1000 ft/Gnd turn on downwind and level off
- Power 22’’ MP, RPM 2000, 90/100 KIAS
- HDG for downwind includes 2* WCA
- Conduct abbreviated approach briefing (A/C configuration (10º flaps), Vref, Vtgt
- CALL ATC
- Abeam threshold - SET Flap T/O and Gear down 90 KIAS
- Turn to base
- Start descent 500 - 600 ft/min
- Maintain 90 KIAS
- Final turn select flaps FULL (full if necessary), reduce to 75 KIAS OR Vtgt and stabilize in slot (PAPI, VASIS)
- Complete final checklist
Vref
1.3 x Vs
Vref
Flaps 0º ________100 KIAS
Flaps T/O_______90 KIAS
Flaps FULL______75 KIAS
Vtgt
1/2 Wind Speed + Gustfactor
Min Vtgt = Vtgt + 5 kts
MAx Vtgt = Vtgt + 15 Kts
7a
Climb with 75 KIAS
7b
At 500 ft/GND 85 KIAS Flap up, and set climb power - 22” MP and
2250 RPM
7c
Turn 90º left / right
7d
Read after T/O checklist