Test Reivew Flashcards

1
Q

While the __________ identifies the work to be done, the _________ identifies the people who will do the work

A
  • Work Breakdown Structure (WBS)

* Organizational Breakdown Structure (OBS)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

__________= BCWP – ACWP

A

Cost Variance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Contracts of _____ or more require a formal EVM system validation.

A

$50M

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

For contracts awarded after July 1, 2012 the _______________________ has replaced the Contractor performance reports and and Integrated Master Schedule (IMS) contractual requirements.

A

Integrated Program Management Report (IPMR)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

There are _____ formats for the integrated program management report (IPMR)

A

7

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The ____________________ is the contractor’s time-phased plan for accomplishing the work on the contract. It establishes the scope, schedule, and budget targets for the program.

A

Performance Measurement Baseline (PMB)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

For the EVM accounting system the PM must be able to account for both labor and ___________ costs

A

Material

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The _______________________ is a formal review conducted jointly between the government and the contractor to assess the validity of control account budgets, resources, and time phasing. It is mandatory for all EVM contracts

A

The Integrated Baseline Review (IBR)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

_____________ provide a forum for communicating across different functional areas, used to clarify design requirements and design maturity, helps determine whether to proceed with development, establishes common baselines and is event, not calendar driven

A

Technical Reviews

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

During the ______________ top-level design for each configuration item function and interface is evaluated to determine if it is ready for detailed design

A

Preliminary Design Review (PDR).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the three configuration baselines.

A
  • functional baseline
  • allocated baseline
  • ***product baseline
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The overall system level baseline which is established during the Technology Maturation and Risk Reduction Phase is the _____________ Baseline

A

Functional

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The _________________ baseline is established latter in the EMD Phase and is the basis for a production contract

A

Product Baseline

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The Acquisition Program Baseline (APB) is developed by the __________for Milestone B, and is updated prior to each Milestone.

A

PM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Only the _________________________ can approve changes to the APB.

A

Milestone Decision Authority (MDA)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Performance parameters considered by the user to be the most essential, and expressed in threshold and objective values

A

Key Performance Parameters (KPPs).

17
Q

The PM has the flexibility tot work within the _________________ between threshold and objective parameters.

A

trade space.

18
Q

When a program deviation occurs the PM must notify the MDA _________ and has __________ to explain the reasons for the deviation and the steps taken to get the program back on track

A
  • Immediately

* 30 Days

19
Q

A Significant Breach occurs when you exceed the current baseline by __________ or the original baseline by __________

A
  • +15%

* +30%

20
Q

For a ___________ Breach, the service secretary notifies congress within 45 days of unit cost report (eg program deviation report) DOD submits a Selcected Action Report (SAR) with required unit cost breach information

A

Significant

21
Q

The sustainment logistics function begins after production has started and ______________ has been declared

A

Initial Operational Capability.

22
Q

What are the three reasons for Loss of vendors for older systems

A
  • Obsolescence
  • ***Diminished Manufacturing Source (DMS)
  • Material shortages
23
Q

__________________includes those logistics support activities that start as soon as the warfighter in the field receives the first system.

A

Sustainment Logistics

24
Q

What are the Three levels of maintenance

A
  • Organizational – Personnel from the using unit make the repair
  • ***Intermediate – The repair is completed at a facility in the field
  • Depot – The repair is made at a major facility for repair by contractor or Government civilian personnel
25
Q

What are the 6 Major Logistics Functions

A
  • Supply
  • Maintenance
  • Transportation
  • ***Civil Engineering
  • Health Services
  • Other Services
26
Q

The __________ is the size and or amount of support assets required to adequately sustain a system at a specific readiness rate for a specified period of time when the system is deployed in its intended (wartime) environment.

A

Logistical Footprint

27
Q

A measure of reliability is:

A

Mean Time Between Failure (MTBF)

28
Q

A measure of maintainability is _______________

A

Mean time to Repair (MTTR)

29
Q

Reliability is comprised of what two types:

A
  • Mission Reliability

* Logistics Reliability

30
Q

The goal of _______________ is the degree to which a systems design an planned logistics resources support its readiness needs and wartime utilization.

A

Supportability

31
Q

What are the Four components that define Downtime

A
  • Logistics Delay when parts are not in stock
  • Administrative Delay when waiting for a mechanic or paperwork
  • Corrective Maintenance for repairs being performed
  • ***Preventive Maintenance when routine service is being conducted
32
Q

A _________ is defined as any real or potential condition that can cause, injury, illness or death to personnel, damage to, or loss of, a system, equipment or property, damage to the environment

A

Hazard

33
Q

What does PESHE stands for?

A

Programmatic Environment, Safety, and Occupational Health Evaluation

34
Q

What are the three ways to analyze and document potential environmental hazards.

A
  • Categorical Exclusion (CATEX)
  • Environmental Assessment (EA)
  • Environmental Impact Statement (EIS)
35
Q

Information on Greening the Government can be found in the_____________

A

Executive Order 13101 (“Greening the Government”)

36
Q

Executive Order 13101 (“Greening the Government”) Directs DoD and other Government agencies to use __________________

A

environmentally responsible products and services

37
Q

A ______________ consists of one or several mechanisms that create the hazard.

A

causal factor

38
Q

A ______________________is an event or series of events resulting in death, injury, occupational illness, damage/loss of equipment or property, or damage to the environment.

A

mishap (or undesired event)