2436 - Reliability, Maintainability, Supportability Flashcards

1
Q

Some of the benefits of ____________ are that it facilitates technology insertion and product modification, lower lifecycle costs as the market is open to a greater number of providers and supports evolutionary acquisition strategies and allows seamless integration

A

Open System Architecture

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The __________ is the size and or amount of support assets required to adequately sustain a system at a specific readiness rate for a specified period of time when the system is deployed in its intended (wartime) environment.

A

Logistical Footprint

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

A measure of reliability is:

A

Mean Time Between Failure (MTBF)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

A measure of maintainability is _______________

A

Mean time to Repair (MTTR)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Reliability is comprised of what two types:

A
  • Mission Reliability

* Logistics Reliability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

_____________, ___________, and ____________issues effect the design process and life cycle costs.

A
  • Reliability
  • Maintainability
  • Supportability
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The impact of failing to fully consider _______________ can decrease supportability and increase cost in all functional areas

A

RMS (Reliability, Maintainability, Supportability) issues

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The goal of _______________ is the degree to which a systems design an planned logistics resources support its readiness needs and wartime utilization.

A

Supportability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Operable for longer periods means:

A

Increased readiness rate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

_______________ varies by system types and military service requirements

A

Logistics Footprint

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the Four components that define Downtime

A
  • Logistics Delay when parts are not in stock
  • Administrative Delay when waiting for a mechanic or paperwork
  • Corrective Maintenance for repairs being performed
  • ***Preventive Maintenance when routine service is being conducted
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The two goals of RMS are:

A
  • Higher operational effectiveness:

* Lower ownership costs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly