2621 - Design Changes Flashcards

1
Q

Who participates in Technical Reviews?

A

Subject Matter Experts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

_____________ provide a forum for communicating across different functional areas, used to clarify design requirements and design maturity, helps determine whether to proceed with development, establishes common baselines and is event, not calendar driven

A

Technical Reviews

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

During the ______________ top-level design for each configuration item function and interface is evaluated to determine if it is ready for detailed design

A

Preliminary Design Review (PDR).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

During the ___________________System specification is evaluated to ensure system requirements are consistent with preferred concept and available technologies

A

System Readiness Review.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

______________ensures that designs are traceable to requirements, interfaces are well defined and understood and change is controlled (“Change Control”) and documented, and product documentation is consistent and current

A

Configuration Management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the three configuration baselines.

A
  • functional baseline
  • allocated baseline
  • ***product baseline
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The overall system level baseline which is established during the Technology Maturation and Risk Reduction Phase is the _____________ Baseline

A

Functional

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The _________________ baseline is established latter in the EMD Phase and is the basis for a production contract

A

Product Baseline

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

________________involves the control and definition of the boundaries at which product subsystems come into contact with other components of the system

A

Interface Management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Once a system is fielded, __________________________becomes the basis for supporting the system.

A

configuration management documentation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the 4 Configuration Management Functions

A
  • Identification
  • Control
  • Status Accounting
  • Audit
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Transitioning design control from the contractor to the Government occurs after _____________

A

design maturation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Test objectives, procedures, and resources are evaluated to determine if the system is ready to begin formal testing

A

Test Readiness Review (TRR)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Alteration in the configuration of an item after formal establishment of its configuration identification requires an_______________ which changes the baseline

A

Engineering Change Proposal (ECP)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The ______________determines which baselines should come under Government control

A

Government

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The _______________will ultimately document the functional, performance, and physical characteristics of the product in a technical data package (TDP).

A

Contractor