Test One Flashcards

1
Q

Return air grilles are shown on drawings by who

A

MEP and Designer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Site Analysis includes

A

walking through the space
reviewing the architectural plans (if any)
measuring the space
photographing the space
determining views from the space
understanding both the neighborhood and social context of the project
documenting the space with drawings including locating structure, utilities, built-ins, and other relevant construction elements
making an inventory of existing furniture and equipment that will be reused, however this may be considered an ancillary or additional service in terms of the contract
analyzing codes and regulations that pertain to the project
determining sustainability requirements and goals for the project

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Program

A

Information gathering generally culminates in a written document written document called that organizes all the information gathered during the analysis phase and documented in a written/graphic format

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Criteria Matrix

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Critical Path Diagram

A

CPM graphicly depicts all the tasks required to complete a project
Sequence of critical tasks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Building commissioning

A

Is the process of inspecting, testing, starting up, and adjusting building systems and then verifying and documenting that they are operating as intended and meet the design criteria of the contract documents.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Systems Calibration

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Performance specifications

A

establish the product requirements based on exact performance criteria used for construction components.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

proprietary specification

A

Most restrictive specific manufacture product

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

reference specification

A

Describes a material product or process based on requirments

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Base Bid Specifications

A

Calls out a proprietary material allowes substitution of other products

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

descriptive specification

A

Performance specification detailed written requirements for the material fabrication and installation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

who is responsible for submitting the Certificate of Occupancy (CO) to the owner

A

Contractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Addendum

A

is a written or graphic document issued by the interior designer before the execution of the contract that modifies or interprets the bidding documents by additions, deletions, clarifications, or corrections.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

bulletin

A

Same as Adendum except after execution of the contract

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Change Directive

A

A written order prepared by ID directing a change in the work before the owner and contractor agree on an adjustment in cost, time or both.

17
Q

During construction changes in the construction work are accomplished by

A

minor changes in the work, by construction change directive or by formal change order.

18
Q

If the glass is less than 50% of the wall area, space is measured to the

A

inside surface of the exterior wall. Columns, recessed entries, and structural projections are disregarded.

19
Q

LCA

A

Life Cycle Assessment

20
Q

By the end of the Programming phase, the designer should have a good understanding of

A

goals for the project
areas, square footages, relationships
basic budget

21
Q

feasibility report

A

a research technique and report used to determine the viability of the proposed project, and a basic budget must first be in place to use as one of the feasibility criteria

22
Q

A contractor’s sworn statement

A

a document, written under penalty of perjury, that details who worked on what during the project and what that person is owed.

23
Q

Concentrated Business Use Occupant load

A

50

24
Q

two basic accounting methods

A

Cash used by single person Accrual

25
Q

fire-rated door assemblies requirments

A

Glass area is limited based on rating.
Labeling is required for both the door and frame.
Closers are always required with fire-rated door assemblies (protected openings).