Technical Reviews Flashcards
____ ____ serve as control gates for management go or no go decisions.
Technical reviews
Technical reviews are good places to redefine the system ____
Baseline
True or False: you must prepare for a technical review.
True
CERR
Critical Event Readiness Review
PLAR
Post Launch Assessment Review
DR
Decomissioning Review
TRR
Test Readiness Review
What Reviews take place in Pre-A:
MCR (Mission concept review)
Needs validation, requirements, and proposed solution
Phase A Reviews:
SRR (System Reqs Review)
- validate requirements
MDR (Mission Definition Review)
- validate achievability of mission objectives
Phase B Reviews:
PDR (Preliminary Design Review)
- establishes the ‘design-to’ baseline
Phase C Reviews:
CDR (Critical Design Review)
- completion of detailed design
- establishes ‘built-to’ baseline
- No design changes after (major)