MISC. Flashcards

1
Q

What are the 3 dimensions of systems engineering?

A

People, processes, technologies

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Architecture is the ____ between needs and scoping.

A

Link

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Name 4 Space Qualifying Tests:

A
  1. Fit Check
  2. Modal Survey
  3. Thermal cycling
  4. Thermal vacuum
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The project plan describes:

A

The who, what, when how, and how much of a project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Pros and Cons of Matrix Organizational Model:

A

Pros:
- wide range of talent working on project
- Only need to pay for personnel on a need basis
Cons:
- sharing management with another manager
- workers only on project temporarily (require acclimation)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

List some risk “trigger questions”:

A
  1. Do the designs or requirements push the current state of the art?
  2. Has an independent cost estimate (ICE) been performed?
  3. Is the schedule adequate enough to handle changes in the requirements or objectives?
  4. Have we identified facilities for all environmental tests? (space env tests)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

” ____ _____” capture risk lessons learned in the past.

A

Trigger Questions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

List some inputs to a typical cost model:

A
  1. Weight
  2. Quantities
  3. Complexity factors
  4. Analogous data points
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

We want the S-Curve to ______ as a project matures.

A

Tighten.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What happened with the NOAA-N failure?

A
  • people forgot to tighten the bolts on the stand, satellite fell over
  • engineers moving the satellite that day did not go through proper verification process for safety
  • $ 135 Million Mistake
  • Pushed timeline back 5 years
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What happened with the FIA project?

A

Future Imagery Architecture

  • poor systems engineering
  • project cost estimation poor
  • poor project scheduling and phasing
  • poor technology readiness assessment
  • project cancellation
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Gentry Lee’s List:

A
  1. Intellectual Curiosity
  2. Ability to make system wide connections
  3. Comfortable with uncertainty/unknowns
  4. Healthy paranoia
  5. Good team member and leader
  6. Self confident and decisive
  7. Appreciation for process
  8. Two-way communicator
  9. Diverse technical skills
  10. Comfortable with change.
  11. Ability to see the big picture
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Name some design fundamentals:

A
  1. make temporary questionable decisions
  2. KISS
  3. descoping
  4. use independent peer reviews
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What happened with the genesis mission?

A

G-switch installed incorrectly

  • Verification reqs not clear enough
  • Function was verified, but not output
  • did not validate/verify because it was a FULL HERITAGE DESIGN
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Gold rule for heritage designs:

A

Test it as if it were new, brand new design.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly