TB Fires 2,4,7,8 Flashcards
What are the 3 types of security dogs?
WAC.
Watch-bark, but don’t attack.
Attack- attack everyone but TRAINER. (They will attack their owner)
Command- attack on trainers commands
What are the 3 major categories of dogs?
Security dogs-trained professionally.
House dogs- trained by owner. Attack anyone but owners friends and family. Can be as dangerous as security dogs.
Household pets-untrained. Bark
** under fire conditions assume all dogs are viscous
A 24 hour number can be called for these dogs. Use it if no smoke present. If smoke, give dogs an avenue to escape. What are the 3 things you do to a dog BEFORE using a hose line?
Direct a water or CO2 extinguisher at the dogs face. Use short bursts. Yell at the dog. Thirdly, let the dog bite a tool or chair and offer resistance so dog hangs on
Who can be special called to dog incidents?
ESU has 2 trucks capable of tranquilizing. Animal care also has a truck. Get ETAs for both
Member gets bitten. What does IC do?
PBA ME. PD Board of Health Animal care and control, if stray Medical officer EMS
What’s the last resort with dogs?
Killing them.
**never look a pit bill in the eyes. Use a 2 1/2 gallon water ext. in the pit bulls face. They will immediately release
Lexan weighs __ the weight of glass and is ___ times stronger. It’s self extinguishing and has __ the thermal conductivity of glass
1/2, 250, 1/3
Where is Lexan found in public schools? Nynex buildings?
Schools- up to 75 feet.
Nynex- cellar, 1st and 2nd floors. Not all have lexan
What tool besides the portable saw with carbide tip is effective on lexan?
Sawzall with a course WOOD blade, although its slower than a power saw
In nynex buildings the lexan is installed on the INSIDE of the window with screws. They also have wire screens and wire glass windows. Do they need to be removed before forcing lexan?
Always!!!
**portables can be used with 3-4 members on the FIRST and Cellar floors
At a blocked incinerator, what’s done first? Burn blockage or use a tool to knock blockage down the chute.
Tool. Bent 10’ rod, 6’ hook, heavy weight TIED to a rope
T or F. When flooding an incinerator shaft the fuel burner MUST be shut down prior to flooding.
False. if possible shut it down before flooding, but it Must be shut down at some point
If blockage is between incinerator and first floor, who clears it and what MUST be done?
LCC and auxiliary burner MUST be shut off BEFORE operation begins
Normally operating across a center divider should be avoided. When its done, whats done with traffic? and when does the company operating across get relieved?
Stopped on BOTH sides. ASAP when another unit comes from the same direction