ACRONYMS Flashcards
Unaffected power removal in subway
“Some Red Heads Spread VD”
- Station lights
- right of way lights
- headlights of train
- Signals
- Ventilation equipment (tunnel)
- Drainage pumping equipment
When a buckeye pipeline leak location is identified, the IC should “LATE”. Explain
The iC should include the following in preliminary report to dispatch :
- Location
- Amount (estimate) of product in the street
- Topography
- Exposures
Handie talkie relay
“Core-t”
Chauffeur- 50 yds from the STAIRS
OV - 50 yards from the MAN
Roof - 50 yards from the STAIRS
Engine officer - approx 100 yards from MAN (roof) line of sight
Truck officer at fire location
- add HT members every 100 yards if necessary
“Real Sexy Vixens Sell Gash”
Collapse ops in order 1-5
Recon Surface removal Voids Selected debris removal General debris removal
“MR. Biological”
2 biological agents that mimic chemical agents
Mycotoxins
Ricin
Pet Crocs are not allowed inside structures
In reference to Gas lines,
PLASTIC and COPPER gas pipes are not permitted inside structures
Shoring 4 feet apart on most recent floor. Assume floor was poured within 24 hrs unless
F
E
S
F - foreman (concrete)
E- engineer ( concrete)
S- superintendent (bldg)
Priority roof access for peaked roof is TAP
T - tower ladder
A - aerial ladder
P - portable ladder
Tenement shaft fires
“Tim Can Contribute Eventually”
Tenements
Control fire in room ,then
Control shaft fire before
Extinguishing fire in room
DOBIM or “DO BI “
Communications 4-7
Transmitted data
Designation eg target hazard Occupancy eg factory Building Information Min response
In regard to description of “building” part of transmitted data, what is the proper order of necessary information?
” HDC” or “ Have Dirty Cocks”
Height of building
Dimensions
Construction type ie class 1,2etc
“IS-SNP”
This is how u get a printout of all units at scene I.e. for a roll call
Incident summary , send, next, print
SIPS
10-80 no code if?
S small release
I identified material
P PPE ( bunker gear is adequate)
S special equipment, training not needed
Acronym for under river rails preliminary size up
“LIVES”
Location or Life Incident info Ventilation Evacuation Safety
M.P. (military police) will be delayed to these two chemical agents?
Mustards
Phosgene
- these 2 chemical agents will have delayed effects
"NSHED" for NFPA 704 Diamond (health blue section) N- 0 S- 1 H- 2 E- 3 D-4
N- 0 ( Normal material) S - 1 ( Slightly hazardous) H - 2 ( Hazardous) E - 3 ( Extreme danger) D - 4 ( Deadly)
"Yellow SUVS May Detonate" NFPA diamond for yellow (reactivity) Yellow S - 0 U - 1 V - 2 S- 3 May Detonate (4)
Yellow S- 0 stable U- 1- unstable if heated V- 2- violent chemical change S- 3 shock and heat may detonate May detonate -4
2ndACT
2nd alarm for:
Advanced
Cellar in
Taxpayer
3rd due truck at high rise office reports “HEEP” on floor above
- Heat And smoke present
- Evacuation stairs **
- Extension
- Presence of access stairs
Mark double clear plastic bag for PPE Decon pickup from Soc with
“CAN”
- contaminant
- assigned unit
- name
- and place biohazard sticker on bag
Hi rise roof kit Requires Bulky Shit For Roof Safety
Required tool bag Bolt cutter Six scba 1 hour FE tools 2 sets (axe and HALLIGAN ) Rabbit tool 2 search ropes