TA - Railroad Flashcards
1
Q
Track destruction should be accomplished at:
A
Curves, switches, frogs, and crossovers
2
Q
Minimum gap of rail destruction
A
20 ft
3
Q
Most critical factor in railroad tunnel demolition
A
The type of rock
4
Q
T type demolition well in tunnel destruction is
A
750 pounds per ends of the well that have a 15 foot thick burden
5
Q
True or false: railroads are most vulnerable to unconventional warfare forces
A
True
6
Q
Three types of locomotives
A
Diesel electric, electric, and steam
7
Q
Priority of attack
A
Division headquarters and Signal links Yard terminals and control centers Track and structures Locomotives Rolling stocks