Start Up Procedure Flashcards

1
Q

Name the three steps for when you start the servers after a full shutdown from the previous day?

A
  • Turn ON the 24 VDC, stdby and main power
  • Turn ON UPS (visuals)?
  • Turn ON UPS for server modules ?
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Why are the circuit breakers for the control loading turned ON in sequence?

A
  • They are daisy chained
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which systems are firewired in FFS and CPT?

A
  • Power Amps -> Electrical Actuators
  • eCLMNT server -> SCS (host computer)
  • eCLMNT -> Power Amplifiers
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is IEEE 1394?

A

Firewire, developed in the 90’s by apple.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Name the steps for turning off/on the control loading cabinet.

A

1) Turn Control Heads OFF; 2) Turn control loading server OFF; 3) Turn OFF AC & DC power; 4) Turn OFF peripheral power.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Why is it important that the control loader turns ON during start-up?

A

Timing connection between the DMS and control loading server and the host computer is working.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly