SPRINKLER / STANDPIPE PROCEDURES P79 Flashcards

1
Q

What is the minimum length of hose to be carried in a High-Rise Kit?

A

200 feet of 13⁄4” hose
or
100ft of 1 3/4 plus 100ft of 2/ 1/2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How should units facilitate carrying the 200’ hose, according to the instructions?

A

Flaked manner, secured with straps or medical tape

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What equipment is recommended to be taken into the building with the High-Rise Kit?

A

Forcible Entry tools and SCBA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the purpose of the 21⁄2”-11⁄2” Reducer in the High-Rise Kit?

To ________ different hoses

A

Connect different hose sizes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

In Situation #1 (Building with sprinkler system only), when is the system charged?

Only if it’s apparent the system needs________

A

Only if it’s apparent the system needs charging

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the starting pump pressure for charging the standpipe in Situation #2 (Building with standpipe installation only)?

A

150 PSI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What action should the next available company take in situations where the first or second pumpers are committed?

A

Cover exposures and attack the fire

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

In a Situation where you have a separate Sprinkler and a separate Stand Pipe System, which should be supplied first?

A

Sprinkler system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What size of hose shall rescues always carry in their High-Rise Kit?

A

1 3⁄4” hose only

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What knowledge is emphasized for all members regarding buildings with sprinkler systems and/or standpipe installations?

A

Location in their First Alarm Territory

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the first action the first arriving company should take upon arrival at a building equipped with sprinklers and standpipes?

a. Immediately charged the sprinkler system with 100 psi
b. Charge the standpipe installation unless directed otherwise
c. Investigate the situation while taking their high rise kit
d. Wait for further instructions from the commanding officer

A

c. Investigate the situation while taking their high rise kit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the first action the first arriving company should take upon arrival at a building equipped with sprinklers and standpipes?

A) Immediately charge the sprinkler system with 100 PSI.

B) Charge the standpipe installation unless directed otherwise.

C) Investigate the situation while taking their High-Rise Kit.

D) Wait for further instructions from the commanding officer.

A

C) Investigate the situation while taking their High-Rise Kit.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the first action the first arriving company should take upon arrival at a building equipped with sprinklers and standpipes?

A) Immediately charge the sprinkler system with 100 PSI.

B) Charge the standpipe installation unless directed otherwise.

C) Investigate the situation while taking their High-Rise Kit.

D) Wait for further instructions from the commanding officer.

A

C) Investigate the situation while taking their High-Rise Kit.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

If it is immediately apparent that the sprinkler system needs to be charged, what is the initial pump pressure the first available pumper should use?

A) 150 PSI

B) 100 PSI

C) 200 PSI

D) 75 PSI

A

B) 100 PSI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the responsibility of the second available pumper upon arrival at a building with sprinklers and standpipes, unless otherwise directed?

A) Assist in investigation with the first arriving company.

B) Charge the sprinkler system with 100 PSI.

C) Charge the standpipe installation.

D) Establish a command post and wait for further instructions.

A

C) Charge the standpipe installation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the responsibility of the second available pumper upon arrival at a building with sprinklers and standpipes, unless otherwise directed?

A) Assist in investigation with the first arriving company.

B) Charge the sprinkler system with 100 PSI.

C) Charge the standpipe installation.

D) Establish a command post and wait for further instructions.

A

C) Charge the standpipe installation.

17
Q

Fire Captain Smith’s pumper is the first apparatus to arrive at a fire emergency that involves a building that only has a sprinkler system. Captain Smith determines that the system needs to be immediately charged. While charging the system, Captain Smith should ensure that the initial starting pump pressure is set at___PSI

A. 75
B. 100
C. 125
D. 150

A

** B. P79