SPRINKLER / STANDPIPE PROCEDURES P79 Flashcards
What is the minimum length of hose to be carried in a High-Rise Kit?
200 feet of 13⁄4” hose
or
100ft of 1 3/4 plus 100ft of 2/ 1/2
How should units facilitate carrying the 200’ hose, according to the instructions?
Flaked manner, secured with straps or medical tape
What equipment is recommended to be taken into the building with the High-Rise Kit?
Forcible Entry tools and SCBA
What is the purpose of the 21⁄2”-11⁄2” Reducer in the High-Rise Kit?
To ________ different hoses
Connect different hose sizes
In Situation #1 (Building with sprinkler system only), when is the system charged?
Only if it’s apparent the system needs________
Only if it’s apparent the system needs charging
What is the starting pump pressure for charging the standpipe in Situation #2 (Building with standpipe installation only)?
150 PSI
What action should the next available company take in situations where the first or second pumpers are committed?
Cover exposures and attack the fire
In a Situation where you have a separate Sprinkler and a separate Stand Pipe System, which should be supplied first?
Sprinkler system
What size of hose shall rescues always carry in their High-Rise Kit?
1 3⁄4” hose only
What knowledge is emphasized for all members regarding buildings with sprinkler systems and/or standpipe installations?
Location in their First Alarm Territory
What is the first action the first arriving company should take upon arrival at a building equipped with sprinklers and standpipes?
a. Immediately charged the sprinkler system with 100 psi
b. Charge the standpipe installation unless directed otherwise
c. Investigate the situation while taking their high rise kit
d. Wait for further instructions from the commanding officer
c. Investigate the situation while taking their high rise kit
What is the first action the first arriving company should take upon arrival at a building equipped with sprinklers and standpipes?
A) Immediately charge the sprinkler system with 100 PSI.
B) Charge the standpipe installation unless directed otherwise.
C) Investigate the situation while taking their High-Rise Kit.
D) Wait for further instructions from the commanding officer.
C) Investigate the situation while taking their High-Rise Kit.
What is the first action the first arriving company should take upon arrival at a building equipped with sprinklers and standpipes?
A) Immediately charge the sprinkler system with 100 PSI.
B) Charge the standpipe installation unless directed otherwise.
C) Investigate the situation while taking their High-Rise Kit.
D) Wait for further instructions from the commanding officer.
C) Investigate the situation while taking their High-Rise Kit.
If it is immediately apparent that the sprinkler system needs to be charged, what is the initial pump pressure the first available pumper should use?
A) 150 PSI
B) 100 PSI
C) 200 PSI
D) 75 PSI
B) 100 PSI
What is the responsibility of the second available pumper upon arrival at a building with sprinklers and standpipes, unless otherwise directed?
A) Assist in investigation with the first arriving company.
B) Charge the sprinkler system with 100 PSI.
C) Charge the standpipe installation.
D) Establish a command post and wait for further instructions.
C) Charge the standpipe installation.