SPP DOC 204-A - Fulltime Supervision Services Flashcards

1
Q

Scope of Services under SPP DOC 204 - A

A

Quality Control
Evaluation of Construction Work
Preparation of Daily Inspection Report
Filing of Documents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Manner of Providing Services

A

Dual as Aor and Consulting Architect
CA for fulltime supervision only

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Method of Compensation

A
  1. Percentage of PCC
  2. Multiple of Direct Personnel Expenses
  3. Prof Fee plus Expenses
  4. Lump Sum or Fixed Fee
  5. Per Diem, Honorarium plus Reimbursable Expenses
  6. Mixed Methods of Compensation
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Limitation of Authority
CSG shan’t:

A
  • assume the responsibility of the contractor’s project superintendent.
  • make decisions on matters that are the sole responsibility of the Aor.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Under the Legal Responsibility, to whom does CSG report to in terms of Administrative matters?

A

Owner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Under the Legal Responsibility, to whom does CSG report to in terms of Technical matters?

A

Aor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Qualifications of Inspectors of the Construction Supervision Group (CSG) :

A

BSArch degree
Extensive Experience

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

This method of compensation of Fulltime Supervision is based on PCC.

A

Percentage of PCC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

This cost-based method of compensation is applicable only to non-creative work such as accounting, secretarial, research, data gathering, preparation of reports and the like.

A

Multiple of Direct Personnel Expenses

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

This method of compensation is based on technical hours spent and does not account for creative work since the value of creative design cannot be measured by the length of time the designer has spent on his work.

A

Multiple of Direct Personnel Expenses

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

This method of compensation is frequently used where there is continuing relationship involving a series of Projects.

A

Professional Fee Plus Expenses

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

This method may be applied to government projects since they entail more paper work and time-consuming efforts.

A

Lump Sum or Fixed Fee

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are these particular activites wherein the Architect will work which will require his personal time and can be paid per Diem or Honorarium?

A
  • attending project-related meetings, conferences or trips;
  • conducting ocular inspection of possible project sites; and
  • conferring with others regarding prospective investments or ventures and the like.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

CSG meaning

A

Construction Supervision Group

How well did you know this?
1
Not at all
2
3
4
5
Perfectly