API RP 580 is intended to provide guidance on developing a Risk-Based Inspection (RBI)
program for ,,,,,, and ,,,, and ,,,,
fixed equipment
piping in the hydrocarbon
chemical process industries
This RP is intended to supplement ,,,,, / ,,,,,,,/ and ,,,,,,
API 510
API 570
API 653
The RBI assessment shall based on ,,,,, and ,,,,,,
probability of failure (POF)
associated consequence of failure (COF)
The RBI assessment shall ,,,,,, evaluate both ,,,,,,
systematically
POF & COF
RBI Assessment:
The POF assessment should be evaluated by considering all credible ,,,,,,,
damage mechanisms
Users of this RP are reminded that no book or manual is a substitute for the judgment of ,,,,,, / ,,,, or ,,,,,,
a responsible,
qualified inspector
engineer
This RP, contains both minimum program requirements to qualify for establishing inspection intervals based on, ,,,,,,;and ,,,,,,,,,
(RBI) analysis &
Rule-based (e.g. 1 /2 life) requirements
This RP by provide additional suggested guidelines by considering both programs ( RBI analysis ) to develop ,,,,,
an effective inspection plan
The use of risk-based methodologies for inspection planning is not,,,,,,; they are optional,
compulsory
Inspection planning is a,,,,,,,,, process that begins with identification of,,,,,, and culminates in an inspection plan
systematic
facilities or equipment
The output of an RBI assessment conducted according to this RP is
an inspection plan for each piece or group of equipment assessed
The RBI plan produced according to the guidance herein combined with IOW & MOC for each process unit should provide the basis for sound management of ,,,,,,,
the integrity of fixed equipment in the refining and petrochemical process industry
RBI is synonymous with,,,,,, /,,,, and ,,,, using risk-based methods.
risk-prioritized inspection,
risk-informed inspection
with inspection planning
The purpose of this document is to provide users with the basic minimum and recommended elements for,,,,,, a RBI program
developing,
implementing, and
maintaining
The approach of this RP emphasizes ,,,, and ,,,,operation through ,,,,,
safe & reliable
risk-prioritized inspection