1
Q

API RP 580 is intended to provide guidance on developing a Risk-Based Inspection (RBI)
program for ,,,,,, and ,,,, and ,,,,

A

fixed equipment
piping in the hydrocarbon
chemical process industries

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

This RP is intended to supplement ,,,,, / ,,,,,,,/ and ,,,,,,

A

API 510
API 570
API 653

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The RBI assessment shall based on ,,,,, and ,,,,,,

A

probability of failure (POF)

associated consequence of failure (COF)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The RBI assessment shall ,,,,,, evaluate both ,,,,,,

A

systematically

POF & COF

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

RBI Assessment:

The POF assessment should be evaluated by considering all credible ,,,,,,,

A

damage mechanisms

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Users of this RP are reminded that no book or manual is a substitute for the judgment of ,,,,,, / ,,,, or ,,,,,,

A

a responsible,
qualified inspector
engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

This RP, contains both minimum program requirements to qualify for establishing inspection intervals based on, ,,,,,,;and ,,,,,,,,,

A

(RBI) analysis &

Rule-based (e.g. 1 /2 life) requirements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

This RP by provide additional suggested guidelines by considering both programs ( RBI analysis ) to develop ,,,,,

A

an effective inspection plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The use of risk-based methodologies for inspection planning is not,,,,,,; they are optional,

A

compulsory

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Inspection planning is a,,,,,,,,, process that begins with identification of,,,,,, and culminates in an inspection plan

A

systematic

facilities or equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The output of an RBI assessment conducted according to this RP is

A

an inspection plan for each piece or group of equipment assessed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The RBI plan produced according to the guidance herein combined with IOW & MOC for each process unit should provide the basis for sound management of ,,,,,,,

A

the integrity of fixed equipment in the refining and petrochemical process industry

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

RBI is synonymous with,,,,,, /,,,, and ,,,, using risk-based methods.

A

risk-prioritized inspection,
risk-informed inspection
with inspection planning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The purpose of this document is to provide users with the basic minimum and recommended elements for,,,,,, a RBI program

A

developing,
implementing, and
maintaining

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The approach of this RP emphasizes ,,,, and ,,,,operation through ,,,,,

A

safe & reliable

risk-prioritized inspection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Data Requirements:

Data inputs and assumptions shall be validated by qualified personnel such as ,,,,,,to review operating parameters used

A

process engineer/operator

17
Q

Damage Mechanisms and Failure Modes:

The RBI team shall consult with a corrosion specialist to define the equipment ,,,,,/,,,,,,,,/ and ,,,,,,,,

A
damage mechanisms, 
damage modes (optional), 
potential failure modes
18
Q

Damage Mechanisms and Failure Modes:
A qualified ,,,,,,,, shall be responsible for assessing the types of damage mechanisms and their
applicability and severity to the equipment considering the process conditions, environment, metallurgy, age, and other relevant data pertaining to of the equipment

A

corrosion specialist

19
Q

POF analysis requirements:

The POF analysis shall address all ,,,,, and

A
  • credible damage mechanisms

- situation can be susceptible to damage mechanisms

20
Q

POF analysis requirements:
Combinations of process conditions and existing materials of construction for each equipment item shall be evaluated to identify ,,,, and ,,,,,

A

active

credible damage mechanisms

21
Q

COF analysis requirements:
COF calculations steps shall be performed to estimate the consequences that are likely to occur due to ,,,, typically resulting from an,,,,,,,

A

a failure mode

identified damage mechanism(s)

22
Q

COF analysis requirements:

The major factors to consider in evaluating the consequences of failure shall include;

A

1- flammable events (fire and explosion)
2- toxic releases
3- releases of other hazardous fluids

23
Q

Requirements for evaluation of risk:

Risk shall be determined by combining ,,,,,

A

POF & COF

24
Q

Requirements for evaluation of risk:

The general form of the risk equation shall be as ,,,,

A

Risk = Probability × Consequence

25
Q

Requirements for evaluation of risk:

Overall risk shall include the probability of ,,,,,

A

loss of containment

26
Q

Output requirements:
The inspection strategy shall be a ,,,,,,to assure that inspection activities are continually focused on items with higher risk

A

documented, iterative process

27
Q

Output requirements:

Inspection results shall be used as ,,,,, in assessing remaining life and future inspection plans

A

variables

28
Q

RBI Benefits and Limitations:

The primary work of the RBI assessment are ,,,,, that address ways ,,,,, on an individual equipment level

A

plans

to manage risks

29
Q

RBI Benefits and Limitations:
RBI plans should include ,,,,, along
with ,,,,,.

A

cost-effective actions

projected risk mitigation

30
Q

RBI Benefits and Limitations:

RBI is based on ,,,,, risk assessment and management principles

A

sound, proven