7 - Data and Information Collection for RBI Assessment Flashcards
The ,,,,,,,, of the data should be consistent with the RBI method used.
precision
It may be advantageous to combine ,,,,,, data gathering
with other ,,,,,, data gathering (see 5.7) as much of the data may be the same
risk analysis
risk/hazard analysis
RBI Data Needs:
For each RBI approach it is important ,,,,,, all bases for the study and assumptions from the onset and to apply a consistent rationale.
to document
RBI Data Needs:
Documentation of ,,,,,, equipment and piping identifiers is a good starting point for any level of study
unique
Data Needs for Qualitative RBI :
It is important to establish a set of rules to assure consistency in ,,,,,, or ,,,,
categorization or classification
Data Needs for Qualitative RBI :
it is important to have ,,,,, perform the qualitative RBI analysis
qualified persons
Data Needs for Quantitative RBI:
Quantitative RBI uses ,,,,, depicting combinations of events that could result in severe accidents and ,,,,,, depicting the progression of accidents and the ,,,,, to the environment
logic models
physical models
transport of a hazardous material
Data Needs for Quantitative RBI:
The models are evaluated ,,,,, to provide both qualitative and quantitative insights about the level of risk
probabilistically
Data Needs for Quantitative RBI:
,,,,,,information and data are needed for a fully quantitative RBI in order to provide input for the models.
more detailed
Data Needs for Semi-quantitative RBI:
The semi-quantitative analysis typically requires the same type of data as a ,,,,,, analysis, but generally not as detailed
quantitative
Data Needs for Semi-quantitative RBI:
Although the precision of the analysis may be less, however, that does not mean that the analysis will be
,,,,,
less accurate
Data Quality :
The data quality has a direct relation to the ,,,,, of the RBI analysis
relative accuracy
Data Quality :
Data inputs and assumptions shall be validated by qualified personnel such as ,,,,, to review operating parameters used
process engineer / operator
Data Quality :
if baseline inspections were not performed or documented, ,,,, may be used for the original thickness
nominal thickness
Data Quality : This assumption (nominal thickness) can significantly impact the ,,,,, early in the equipment life.
calculated corrosion rate
Data Quality :
The ,,,,, error may result in the calculated corrosion rate appearing artificially high or low
measurement
Data Quality :
validation step stresses the need for ,,,,, comparing data from the inspections to the expected damage mechanism and rates.
a qualified person
Data Quality :
,,,,,, may be useful in this review
Statistics
Codes and Standards:
The selection and type of codes
and standards used by a facility can have a ,,,,impact on RBI results.
significant
Sources of Site-specific Data and Information:
Information for RBI can be found in many places within ,,,
a facility.
Sources of Site-specific Data and Information:
It may be advantageous to combine ,,,,, data gathering with other ,,,,, data gathering [e.g. PHA, RCM, quantitative risk assessment (QRA)] as much of the data overlaps.
RBI data
risk/hazard analysis