13 - Other Risk Mitigation Activities Flashcards
1
Q
,,,,, may not always provide sufficient risk mitigation or may not be the most cost-effective method
A
inspection
2
Q
Sometimes equipment is over designed for the process conditions. ,,,,,, the equipment may result in a reduction of the POF assessed for that item
A
Rerating
3
Q
Emergency isolation capability can reduce toxic, explosion, or fire consequences in the event of a ,,,,
A
release
4
Q
Proper ,,,, of the isolation valves is key to successful risk mitigation
A
location
5
Q
,,,,,,, is a process parameters (both physical and chemical) that could impact equipment integrity if not properly controlled.
A
IOWs