Slump Flow Of Concrete Flashcards
The maximum nominal size of aggregate in the concrete sample that is appropriate when a slump flow test is to be performed is blank
28
The concrete contains aggregate larger than allowed, and the slump flow test must be performed. What must be done to the concrete sample
It must be wet sieved over a 28 mm sieve
The requirements for the test specimen mould when performing the slump flow test are the same as blank with the exception of blank, which are not mandatory for this test method
Slump test / two foot pieces
The minimum slump flow board dimensions are blank
800 mm squared
The slump flow test must be completed within blank minutes of obtaining the sample, including transportation and remixing
10
Piece of finished plywood makes a good slump flow board
False
The slump flow cone should be in dry condition before beginning to test
False
The maximum time permitted from the start of filling the cone with concrete to the lifting of the cone from the base is blank
3
What is the time allowed for lifting the slump cone
3 +- 1 second
To what height should the swamp flow cone be raised?
225 +- 75 mm
A minimum sample size of 20 L is required for all slump flow tests
False
When performing the slump flow test the surface shall be a _____ having a minimum thickness of ______ mm. The surface shall be in a _______ and ______ position, not subject to _______.
Rigid, non absorbent, smooth plastic surface / 12 / flat / level / vibrations
The slump flow cone may be filled in the _______ or ________ position and must be filled in _______ layers when performing the slump flow test
Upright / inverted / one
The slump flow cone must be filled in the blank position when the T50 time is performed
Upright
Two concentric circles are to be marked the inner circle is to _______ the position of the mould and the outer circle is to have a diameter of ______
Centrally locate / 500 mm