Density And Yield Of Plastic Concrete Flashcards

1
Q

The maximum specified slump at which vibration is usually used is blank

A

40 mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When calculating the volume of the measure for calibration purposes, it is to be filled with water between blank and blank

A

20 / 25

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The balance or scale used to perform a density test must be sensitive to within blank

A

0.05 kg

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

If riding is used as the method of consolidation, the measure must be filled in blank layers

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

For 7 L measure required number of strokes of the tamping rod for consolidation of each layer is black

A

25

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Concrete produced using 40 mm nominal maximum size course aggregate with no aggregate retained on the 40 mm sieve may be tested using the 7 L bowl.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

For the top two layers, the tapping rod chop, penetrate about blank into the underlying layer

A

25 mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

If vibration is used as the method of consolidation, the measure must be filled in blank layers

A

Two

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

On completion of consolidation, what should be done to correct a deficiency if the concrete layer is slightly below the top of the measure

A

Add a small quantity of concrete

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What tools are required to perform
1. Initial strike off
2. Intermediate strike off
3. Final Strike off

A
  1. Tamping rod or Strike off bar
  2. Strike off Plate
  3. Strike off Plate
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

After completing the strike off procedure what must be done prior to obtaining the gross mass

A

Clean off all excess concrete

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Mass measurements Shelby determined to the nearest blank

A

0.05 kg

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Density of concrete should be recorded to what accuracy

A

1 kg/m3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly