Sampling Plastic Concrete Flashcards

1
Q

This standard practice specifies the _______, _________, and ___________ required to obtain a representative sample of fresh concrete and to assess its traceability to the structure it represents

A

Procedures, Location, and sample size

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The procedures used in sampling include every precaution that will assist in obtaining samples that are truly representative of the _________ and ________ of the concrete.

A

Nature / conditions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Intermittent scooping of the sample in shovelfuls or bucketfuls into a wheelbarrow or tray as the concrete continues to flow down the delivery chute is an acceptable technique? T/F

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The concrete sample must be protected at all times from _______, _______, and _______, and from _______

A

Sun / wind / other sources of rapid evaporation / contamination

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The minimum size sample for making three 100 mm x 200 mm cylinders is _______,

A

20 litres

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

When sampling from a truck agitator or truck mixer, the sample shall be taken between the _______, and _______, points of the discharge

A

10% / 90%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When the concrete contains aggregate larger than that appropriate for the size of the moulds or equipment to be used, the sample shall be _______, prior to testing.

A

Wet Sieved (Except for Density Tests)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When sampling for uniformity of mixed concrete, _______, grab samples shall be obtained from _______, portions of the batch

A

Three / widely separated

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The temperature of the concrete must be determined within _______, minutes immediately after obtaining the sample

A

5 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Air content, bracket pressure method and bracket measurement, and the test for slump shall both be completed within _______, minutes after sampling, including transportation and remixing.

A

10 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Moulding of compression or flexural strength specimens shall be completed within _______, minutes after sampling, including transport and mixing

A

20 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Air content bracket biometric method bracket shall _______, within _______, minutes after sampling, including transport and remixing

A

Start / 5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What document produced by the concrete supplier contains information relating to identification of the concrete sample?

A

The delivery ticket

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Describe the operation of obtaining sample for evaluation of concrete quality.

A

Contain a single grab sample at one point of the discharge in as short time as possible

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Between what two points of the mixer discharge must the concrete be sampled?

A

The 10% and 90% points

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How is the sample obtained from discharge stream of a mixer truck?

A
  • pass receptacle completely through discharge stream
  • or completely divert discharge stream into sample container
17
Q

What is the minimum size of sample to be obtained when strength specimens are to be molded?

A

20 L on 100 x 200 cylinders
30 L 150 x 300 mm cylinders
55 L when three flexural beams are made

18
Q

From what conditions must the concrete sample be protected?

A

Sun
wind
rapid evaporation
contamination

19
Q

What must be done between taking the sample from the mixer and performing the test?

A

Transport the sample to the place where the test are to performed
Remix with the shovel
When multiple containers are used to obtain a grab sample, the sample shall be remixed into a single composite grab sample

20
Q

What is the time limit for completion of sampling?

A

10 minutes

21
Q

The test for temperature must be completed and how many minutes after obtaining the sample

A

Five minutes

22
Q

The test for temperature and air content must be completed with how many minutes after the sample has been transported and remix

A

10 minutes

23
Q

Morning of strength test specimens must be completed within how many minutes after sample has been transported and remixed

A

20 minutes