Air Content Of Plastic Concrete By The Pressure Method Flashcards

1
Q

The pressure method of determining air content is not suitable for concrete containing what type of aggregate

A

Low density or other porous aggregates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the maximum size aggregate allowed in the concrete sample when this test method is to be performed in a 7 L bowl?

A

40 mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When the concrete sample contains a bit larger than the maximum allowed for a 7 L measuring bowl what must first be done to the concrete sample before running the test

A

Must wet sieve through 40 mm square openings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

In how many layers is the measure to be filled when the concrete sample will be compacted by rodding

A

Three layers of

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How many layers is the measure to be filled when the concrete sample is self consolidating concrete?

A

Two layers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

When rodding the concrete sample in a 7 L bowl what is the specified number of strokes required for each layer?

A

25

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

After drawing each layer which be done to the measure before adding another layer of concrete

A

Outside should be tapped smartly, 10 or more times with a mallet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Rocking and shaking the bucket against the ground after riding each layer is an acceptable consolidation technique to replace the mallet. T/F

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The concrete shall be vibrated with a specified slump of

A

40 mm or less

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When internal vibration is used as the consolidation technique, the measure shall be filled in blank layers

A

Two approx equal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When ordering the concrete by internal vibration, the vibrator shall be inserted at blank for each blank

A

Three points / layer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What must be done if there’s a slight deficiency in the quality of concrete in the measure following consolidation of the final layer

A

Add a small amount of concrete with the scoop to correct a deficiency before strike off

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How soon after the concrete sample has been transported and remixed most pressure metre air test be completed

A

10 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Air content by the pressure method must be reported to the nearest

A

0.1 %

How well did you know this?
1
Not at all
2
3
4
5
Perfectly