Section 3.8.1 AC Sources Flashcards
What is LCO 3.8.1?
The following AC electrical sources shall be OPERABLE:
a. Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System; and
b. Two Diesel Generators (DGs) each capable of supplying one train of the onsite Class 1E AC Electrical Power Distribution System.
When is LCO 3.8.1 Applicable?
MODES 1, 2, 3, and 4.
What is condition A of LCO 3.8.1?
One offsite circuit inoperable.
What are the required actions and completion times for Condition A of LCO 3.8.1 (one offsite circuit inoperable)?
Perform SR 3.8.1.1 (offsite source check) for OPERABLE offsite circuit within 1 hour and once every 8 hours thereafter.
AND
Restore offsite circuit to OPERABLE status within 72 hours and 10 days from the date of discovery to meet LCO.
What is condition B of LCO 3.8.1?
One DG inoperable.
What are the required actions and completion times for Condition B of LCO 3.8.1 (one DG inoperable)?
Perform SR 3.8.1.1 (offsite source check) for the OPERABLE offsite circuit(s) within 1 hour and once every 8 hours thereafter.
AND
Declare required feature(s) supported by the inoperable DG inoperable when its redundant required feature(s) is inoperable within 4 hours
AND
Determine OPERABLE DG is not inoperable due to common cause failure with 24 hours OR perform a SR 3.8.1.2 (start test) for OPERABLE DG within 24 hours
AND
Restore DG to OPERABLE status within 7 days.
What is condition C of LCO 3.8.1?
Two offsite circuits inoperable.
What are the required actions and completion times for Condition C of LCO 3.8.1 (Two offsite circuits inoperable)?
Declare required feature(s) inoperable when its redundant required feature(s) is inoperable within 12 hours.
AND
Restore one offsite circuit to OPERABLE status within 24 hours.
What is condition D of LCO 3.8.1?
One offsite circuit inoperable.
AND
One DG inoperable.
What are the required actions and completion times for Condition D of LCO 3.8.1 (One offsite circuit inoperable AND One DG inoperable.)?
NOTE: Enter applicable Conditions and Required Actions of LCO 3.8.9, “Distribution Systems - Operating,” when Condition D is entered with no AC power source to any train.
Restore offsite circuit to OPERABLE status.with 12 hours.
OR
Restore DG to OPERABLE status within 12 hours.
What is condition E of LCO 3.8.1?
Two DGs inoperable.
What are the required actions and completion times for Condition E of LCO 3.8.1 (Two DGs inoperable.)?
Restore one DG to OPERABLE status with 2 hours.
What is condition F of LCO 3.8.1?
Required Action and Associated Completion Time of Condition A, B, C, D, or E not met.
What are the required actions and completion times for Condition F of LCO 3.8.1 (Required Action and Associated Completion Time of Condition A, B, C, D, or E not met.)
Be in MODE 3 in 6 hours.
AND
Be in MODE 5 in 36 hours
What is condition G of LCO 3.8.1?
Three or more AC sources inoperable.