SCBA/Fast-Pak/Pak-Tracker Flashcards
Because the facepiece does not cover the ears, airborne contaminants can enter the respiratory tract through a ___ or ___ eardrum
Punctured or ruptured
A confined space is defined as any area that is not designed for ___ human occupancy. Large enough so a person can ___ and ___. Has limited means for ___ and ___
Continuous
Enter and Work
Entry and Escape
The SCBA cylinder holds ___ breathing air
Purified
The service life of a cylinder is ___ years
15
Hydrostatic testing is done every ___ years. 10 minute escape cylinders used by SOC units for confined space need to be hydrostatic tested every ___ years
5
3
Inspect all spare cylinders (depots, high-rise units, company and reserve apparatus) weekly on ___ for FULL pressure
Mondays
Designated training cylinders are designated with a ___ top and/or a ___ protective sleeve
blue
polymer
Consisting of two systems the PRA normally reduces the operating pressure to ___ psi before entering the regulators low pressure hose
100 psi
The regulator then controls the pressure within the face piece to slightly ___ atmospheric pressure
Above
A malfunction of the PRA’s primary system will automatically direct breathing air into a secondary system. When this occurs, the operating pressure will only be reduced to ___ psi and the vibralert alarm to activate. Member must notify their officer and immediately leave the contaminated area accompanied to a safe area by another member using an SCBA.
150
Failure of both the primary and secondary systems in the open position will activate a relief valve in the PRA, which will rapidly discharge all pressure in excess of ___ psi into the atmosphere. When this occurs the cylinder valve should be ___ ___ allowing only a minimal amount of air to release, permitting the member to both breath and conserve air. The member must notify their officer and immediately leave the contaminated area accompanied to a safe area by another member using an SCBA
185
Partially closed
If the manual shut-off fails to release for any reason, turn the red purge valve ___, ___ degrees to start the flow of air
Downward
180 degrees
If failure of the regulator in the open position (too much air flow in the face-piece), air-flow can be controlled by opening the purge valve ___ and ___ closing the cylinder valve.
Fully
Partially
The vibralert and HUD work ___ and may not activate at precisely the same time.
Independently
Will the vibralert alarm for malfunction of the PRA’s primary system?
Yes
The spray bar on the regulator is comprised of ___ small holes
9
When the cylinder valve is turned on the HUD will initialize and illuminate for ___ seconds
20
Two green indicator lights on the HUD mean
The cylinder is full
One green indicator light on the HUD means
3/4 cylinder
One yellow indicator light flashing slowly (once a second) means
1/2 cylinder
One red light flashing rapidly (10 times a second) means
1/4 cylinder (Leave the hazardous area)
When the batteries require changing, the round low battering indicator at the far right of the HUD will light for ___ seconds and begin to flash slowly at ___ a second
20 seconds
Once a second
Color of Face-pieces:
Green
Black
Red
Green/small
Black/comfort seal
Red/Extra Large
Units requiring a spare small or extra large face piece shall contact their?
Division
When putting on the face piece in what order do you pull the straps?
First the bottom and then the top
If the sensor module does not sense motion of the SCBA for ___ seconds, the Pak Alert SE 7 will signal a pre-alarm condition. If there is still no motion of the SCBA for the next ___ seconds, the full alarm will sound
20 seconds
12 seconds
The full alarm on the SCBA can only be cleared by?
Manually pressing the reset button twice, located on the side of the control console
If while using the SCBA, the batteries begin to approach the end of their useful life, the sensor module will begin to sound a chirp every ___ seconds and the green light on the control module will go out
2 seconds
SCBA’s must be inspected when (3)
- Immediately after the 0900 and 1800 hour roll calls
- Immediately before the start of MUD
- After each use
If a cutting tool is to be used, it is best to keep it in the ___ pocket of the bunker coat
Right
If a leak from a damaged face-piece is more than can be controlled with one hand continue to cover as much of the damaged area as possible. Press the ___ ___ ___ after each breath to further limit the loss of breathing air. If the damaged area is too large to allow the regulator shut-off to release, then use the ___ ___ in an ON and OFF motion for each breath. This action helps to conserve the limited amount of breathing air necessary for escape.
Manual Shut-Off Switch
Purge Valve
When one member forcibly strikes another member with ___ distinct blows on the shoulder and then pulls that member in a specific direction, the second member will recognize that the other member knows of an emergency and should promptly follow in that direction.
4
A hypochlorite solution consisting of ___ cup of household chlorine bleach to ___ gallon of water (1:100 dilution) is recommended by the Center for Disease Control. Tech Services distributes bleach packages, use ___ package to ___ gallon of water.
One quarter cup
One gallon
One package to one gallon
Immerse face piece in the hypochlorite solution for ___ minutes, wiping lens with cloth.
5
When cleaning regulator what percentage of Isopropyl Alcohol is used?
70
Concerning the cleaning of the regulator. Depress the manual shut-off, close the purge valve, and spray a minimum of ___ full pumps of the 70% Isopropyl Alcohol into the regulator opening. Allow for ___ minutes of contact time to disinfect prior to rinsing.
6
10