S&W Using Cetrifuge Flashcards
Maximum allowable S&W for crude in the GOM?
1%
Maximum allowable S&W for crude in the Western Region?
3%
Minimum temperature to preheat centrifuge in the GOM?
140 deg. F +/- 5
Minimum temperature to preheat centrifuge in the Western Region?
160 deg. F +/- 5
What is the minimum centrifugal force a sample tube must have in a centrifuge.
A force of 500 at the tip of the tube.
What is the maximum variation in temperature the sample tube can have after spinning?
15 deg. F
What are the requirements of a sample tube?
Shall be 200 part (100 mL) cone shaped and 6-8 inches in length. Must be NIST traceable and volumetrically or gravimetrically certified.
What is the minimum graduation degree a thermometer must have?
2 degrees or less.
When thermometer is compared to a working thermometer what is the maximum difference in deg. F allowed?
1 deg. F
When do you heat the sample tube?
Before and after heating.
How many times should you invert the sample tube?
A minimum of 10 times.
How long should you spin the sample?
A minimum of 5 minutes.
If the S&W content is less than 0.025% what should the volume be recorded as?
0%
What is the maximum difference allowable between two sample tubes?
One subdivision.
How many decimal places should you report from a sample tube.
Three decimal places.