RPV Instrumentation Flashcards
What automatic level actions come from narrow range level instruments?
High level trips and LL1
What #’s are the Narrow Range Detectors and what range do they measure?
N004, N017, N042 They measure from 150”-210”
What #’s are the Wide Range Detectors and what range do they measure?
N024, N025, N026, N031 They measure from 0”-210”
What #s are the Shutdown Range Detectors and what range do they measure?
N027A and N027B They measure from 150”-550”
What #’s are the Fuel Zone Detectors and what range do they measure?
N036 and N037(with a R615 Recorder) They measure from -150” to +150”
What conditions are the Narrow Range Instruments calibrated in and are the reference legs compensated?
Calibration: NORMAL CONDITIONS • 1030 psig reactor pressure • Drywell temperature 158°F • Reactor building temperature 70°F All instruments are Uncompensated Reference legs inside the drywell.
What conditions are the Wide Range Instruments calibrated in and are the reference legs compensated?
Calibration: HOT, but NORMAL • 1000 psig reactor pressure • Reference leg drywell temperature 200°F • Variable leg drywell temperature 135°F • Reactor Building temperature 90°F Compensated reference legs, except for instruments used on RTGB (N026)
What conditions are the Shutdown Range Instruments calibrated in and what happens to the instruments during refueling?
Calibration: NORMAL SHUTDOWN CONDITIONS • Reactor pressure 0 psig • Drywell temperature 70°F • Rx Bldg temperature 70°F • For alternate, Drywell/RPV temp 85°F Alternate transmitters (7468) provided for instrument input for refueling operations per GP-06 (head removal). These are pressure instruments, not D/P. Reference leg piping is removed during vessel head disassembly
What conditions are the Fuel Zone Instruments calibrated in and are the reference legs compensated?
Calibration: CASUALTY CONDITIONS. • Reactor pressure 0 psig • Drywell temperature 350°F • Reactor Building temperature 140°F • NO JET PUMP FLOW Density compensated reference legs • Indication uses output from master units on ECCS analog trip cabinets • These indications are not accurate if RR pumps are running
What wide range instruments are least affected by LOCA and why?
N026A&B - most of the reference leg is in the reactor building
What wide range instruments are most affected by HELB in the reactor building?
N026A&B most of the reference leg is in the reactor building
What are the Power supplies for the Narrow Range Instruments and Recorders?
Power: Instrument loops from DFWCS UPS Panel V9(10)A Div. II DC Panel 3(4)B Recorder power UPS Panel V7(8)A Fail As Is (FAI)
What are the Power supplies for the Wide Range Instruments and Recorders?
Power: 26A/B instrument loops from 120 VAC Emergency power 26A Panel 31(32)A (E5/E7) 26B Panel 1(2)B (E6/E8) Recorder power UPS Panel V7(8)A Fail As Is (FAI) Remote Shutdown panel uses N026B transmitter and transfers instrument loop power to Div II DC MCC 1(2)XDB
What RPV level indications are available in the control room with a loss of all AC power?
N004A/B/C (narrow) N036 (fuel)
What is the Function of the N004’s?
• P603 Indication • Hi / Low level alarm • Input to DFCS for RPV level control • Level signal for recirculation limiter #2 • Main turbine & RFP high level trip