Recirc and VFD Flashcards
What is 100% core flow?
77 Mlbm/hr
What is rated feedwater flow?
12.8Mlbm/hr
What powers the Discharge (F031A/B) and Discharge Bypass (F032A/B) valves?
Same division opposite unit 480V E bus
What causes auto closure of Discharge and Discharge bypass valves?
LPCI initiation AND RPV pressure <310psig
What is the power supply for the Suction valves (F023A/B)?
Same unit division 480V e bus
What auto closes the Sample valves (F019, F020)?
Group 1 signals LL3 (45”) or Low condenser Vacuum (10”) ONLY
What is the air supply for each sample valve?
F019 - N2 F020 - Air
What are the recirc pump start permissives?
Seal Staging valve in manual/open Switchgear control power available Suction Valve Open Bypass Valve Open Discharge valve open
What will trip the RCR Input Circuit Breaker (and trip a RCR pump)?
Discharge valve <90% open AND Bypass valve not full open
Suction valve <90% open
ATWS ARI signal (LL2 105” or RPV pressure 1137.8psig)
UV on B bus
Overcurrent (ICB or VFD output)
Overfrequency (VFD output)
Emergency stop PB
Open Breaker PB
What actions are required if RBCCW is lost to a recirc pump?
Restore or secure pump in 10 minutes
What actions are required if RBCCW and CRD flow are lost to a recirc pump?
Secure pump in 90 seconds
What are the temperature requirements to start the 1st recirc loop? (no loops running)
TOP to Bottom <= 145dF
AND
Loop to Vessel <= 50dF
What are the temperature requirements to start the second recirc loop? (one already running)
Top to Bottom <=145dF
AND
Loop to Loop <= 50dF
AND
Operating loop <= 50% flow (23,500gpm U1/ 24500gpm U2)