Revision sheet 2 Flashcards

1
Q

Describe the initial actions in the event of a primary coolant spill (person at the scene)

A
  1. Raise the alarm
  2. Establish a no go area
  3. Stand still
  4. Attempt to contain the spill using a spill pack
  5. MA at the scene will run the particulate monitor
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

State the function of the electrical generation and distribution system

A
  1. To generate power for submarine systems to function whilst at sea and alongside in the event of a ss failure
  2. receive both AC and DC ss whilst in harbour
  3. Safely distribute a source of both AC and DC supplies for all SM systems
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

List 5 different types of electrical supplies

A
  1. 440v 60hz 3ph AC
  2. 115v 60hz 3ph and 1ph AC
  3. 115v 400hz AC
  4. 265v dc nominal
  5. 24v dc
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

list 4 essential AC services

A
  1. MCP’s
  2. AC lub oil pp
  3. After plant hydraulic pumps
  4. Compartment lighting
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

List 4 examples of DC services

A
  1. EPM
  2. DC lub oil pp
  3. h2 clearance fans
  4. Secondary compartment lighting
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

List 4 non essential AC supplies

A
  1. Extraction pp
  2. ATU
  3. HPAC’s
  4. sewage pp
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How many AC and DC shore supply cables can be connected alongside?

A

8x Shore supply cables AC
4x Shore supply cables DC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is an electrical audit and when would these be carried out?

A

An electrical audit is carried out in the event of an electrical failure when losses need to be established

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Produce for reducing electrical loads in the event of a reactor scram

A
  1. The ships company will switch off all non essential equipment within their compartments
  2. The amount of load reduction depends on the type of scram
  3. We only use the EPM for propulsion during load reduction
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

List the names and system codes of all cooling water systems fitted on board

A

Ships fresh water cooling fwd and aft (AW)
RCFW (B)
Diesel sea water cooling (DSW)
Chilled water (AC)
Main circulating water (CW)
HPDHR cooling sea water (ESW)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly