RCS Flashcards

1
Q

When RCS > what temperature, is
a continuous MU bypass flow of
how many gpm to B HPI?

A

> 250F, flow of 3 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

Be at least what delta k/k
shutdown if the most conservative
WR cold leg temp is less than
what?

A

1% delta k/k, <525F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Do NOT open pzr spray valve
unless delta T between RCS and
pzr is less than or equal to what
temperature?

A

250F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Maintain RCS dissolved gas <
what setpoint H2O to prevent
accumulation in CRDM?

A

<100 cc/kg H2O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Pzr H/U and C/D rate?

A

100 F/HR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Maintain min pzr spray bypass
flow of what gpm when RCS >
what temperature?

A

.75 gpm and RCS >200F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

When venting pzr to RCDT at low
pressure, avoid large pressure or
level transients by using what?

A

Small taps on RC-V-28 OPEN
pushbutton

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Tech specs
Leakage: basis is “leak before
break” strategy

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When Rx critical > what percent power,
how many RCS leak detection systems
of different operating principles shall be
in operation with X of X sensitive to
radioactivity. Systems may be OOS up
to how many hours provided RB atm
samples how many hours?

A

> 2%
2 RC leak detection systems
1 of 2 sensitive to radioactivity
OOS up to 72 hours
RB atm sampled 8 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Normal Makeup flow path

A

RC-P-1B discharge via B HPI/MU-
V-17

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Letdown flow path

A

RC-P-1C suction line via MU-V-
1A/B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Pressurizer Surge line

A

A Hot Leg

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Pressurizer spray line

A

RC-P-1A discharge via RC-V-1/3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Drop Line

A

B hot leg via DH-V-1/2/3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

HPI

A

RCP discharge lines via MU-V-
16A/B/C/D

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

LPI

A

CF Nozzles via DH-V-4A/B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Once through steam generators (RC-
H-1A/B)
EFW nozzles: how many nozzles per
OTSG, sprays where to promote what
and reduce thermal stress on what?

A

7 nozzles per OTSG, sprays on
tubes to promote natural circulation,
reduce thermal stresses on the
lower tube sheet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Tube to shell DT: tensile and
compressive temperatures

A

-70F (tensile) or +60F
(compressive)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

RCDT (WDL-T-3): Auto signals does
what?

A

IC-V-20 opens w/ WDL-P-8 starts
(110F, trips @ 105F if IC-V-4 is
OPEN).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

RCDT relief valve set point

A

40 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

RCDT rupture disc setpoint

A

55 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

OTSG milestones High to Low (just
percentages)

A

97.5% HSPS FW isolation (2/4)
90% ICS HLL (auto control)
88% HI OTSG level alarms
75-85% Loss of 25F SCM
50% Loss of 4 RCPs HSPS Auto
contro

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

OTSG milestones High to low (just inches
of vacuum)

A

25” S/U LLLs (AUTO), HSPS EFW
control (Auto)
- Loss of both FWPs, 10” OTSG,
4#RB
20” S/U OTSG low level alarm
10” S/U HSPS low OTSG lvl EFW
AUTO start

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Pressurizer RC-T-2 capacity

A

12 gal/inch

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Pressurizer RC-T-2 Heaters, how many
groups and how many heaters in each of
how many banks?

A

13 groups, 9 heaters in 5 banks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

Pressurizer Heater Banks, which ones
and how are they controlled?

A

Banks 1,2,3 are SCR Controlled
(variable heat demand)
Banks 4 and 5 are bistable
Controlled (on/off)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

Pressurizer heater control table,
setpoints

A

Find table

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

Where does MU come in?

A

MU from downstream RCP B
between pump and RX

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

Where does HPI come in?

A

Between all RCP and RX

29
Q

Where is let down go?

A

Suction side of RCP C

30
Q

Pressurizer Power Supply:

A

1E and 1F 480V switchgear, 1A and
1B PZR Heater MCC’s

31
Q

Pressurizer emergency power

A

Group 8 or Group 9, 1P or 1S 480V
switchgear

32
Q

Pressurizer interlocks
All heaters De-energize at what
pressurizer level (what level does it
uncover) EXCEPT when powered
from where?

A

80” pressurizer level (63.5”
uncovered) EXCEPT when
powered from 1P/1S ES switchgear

33
Q

Can’t energize heaters < what pzr
level (interlock bypass key where?)
ON a loss of what you would need to
defeat the interlock that actuates.

A

<80” (interlock bypass key in
ICS/NNI cabinet) ON a loss of ICS
AUTO power, interlock actuates
and you need to defeat this

34
Q

Which pzr groups trips on Es?

A

Groups 8 and 9

35
Q

Which group has 69 bypass on 1s
480v to prevent tripped on ES when
in emergency?

36
Q

Pzr level control
Nominal level ensures pzr does not
what post trip to prevent what?

A

Ensures pzr does NOT empty post
trip to prevent loss of SCM

37
Q

Pzr tech specs
Pzr HU and CD rates shall NOT
exceed what F/hr?

38
Q

RX shall be maintained subcritical
>what percent deltaK/k until pzr
level what to what inches or else be
in HSD w/ CRD breakers Open in
how many hours and CSD in how
many hours?

A

> 1% deltak/k until pzr level 80-385”
or else
Be in HSD w/ CRD breakers OPEN
in 6 hours and CSD in 30 hours

39
Q

Pressurizer spray power supply

40
Q

Pressurizer spray
Auto signals:

A

Close at 2155#, OPEN at 2205#
RCS to 40%@ 140 gpm

41
Q

Manual Control: RC-v-1 can be
OPENED in JOG up to 100% (190
gpm). Must place switch back to
what position, will only close at what
pressure in auto?

A

Auto
2155# in Auto

42
Q

Where is HPI come in at?

A

RCP discharge side on all legs

43
Q

RCITS

A

HOT leg level: RCPs off
Reactor vessel level: RCPs off
% void fraction: RCP’s operating
RCS Drain Down Level: RCS
drained down

44
Q

MU-V-17 normal makeup

A

220” by the MU system using
normal MU valve, MU-V-17 in
automatic and letdown flow

45
Q

Dry OTSG

A

<200 psig below saturation
pressure
And less than 6”

46
Q

If you have a void in the hotleg can
you have natural circulation?

A

No you can’t establish natural circ
with a void in the hot leg

47
Q

Can’t start a 4th RCP unless you’re
above what temperature

48
Q

Why do we need to compensate pzr
level temperature?

A

It’s a differential pressure detector

49
Q

How many pressure detectors in A
hot leg? What pressure bands and
used for what?

A

5, two narrow ranges/rosemound detectors: 1700-2500
psig
For RPS, PORV, heaters and spray
2 wide ranges/bourdon tubes
0-2500 psig
For ESAS, PORV, DH interlocks
One wide range rosemount detector
Safety grade (post accident)
0-3000 psig
Used for Tsat memters, DSS trip

50
Q

What type of flow tube in each hot
leg? Connected to how many
differential pressure instruments?

A

Gentile flow tube
Connected to 4 differential pressure
instruments

51
Q

Pressurizer spray
Purpose, if spray fails OPEN, plant
may remain online by doing what?

A

Condenses steam to reduce pressure,
RC-P-1A discharge normal source.
Kept online by closes RC-V-3 (block
valve) which is the pressurizer spray
isolation valve

52
Q

Power supply to spray isolation
valve (RC-V-3)

53
Q

Pressurizer spray isolation valve
(Rc-v-3)
Purpose

A

Isolations (full open/close) if rc-v-1 fails
but eliminates bypass flow

54
Q

Pressurizer spray isolation bypass
(rc-v-24)
Purpose

A

Maintains .75-1.5 gpm flow around
spray valve RC-V-1 to prevent
thermal shock to the spray valve and
nozzle and continuous outflow from pzr
to equalize boron concentration
“mixing” (within 50 ppm)

55
Q

Pressurizer Aux Spray (RC-V-4)
Type of valve, power supply,
purpose

A

MOV
1C ES valves MCC
Provides pzr spray at low pressures
during cooldown from discharge of
decay heat pumps

56
Q

High Pressure relief
PORV (RC-RV-2)
Type of valve?
Power supply?

A

MOV/SOV
1C 250V DC

57
Q

PORV
Auto signals

A

OPEN at RCS #2450, CLOSE at RCS
#2400

58
Q

PORV Tech specs
LTOP porv pressure when RCS is
less than what temperature? How
long to restore or verify pzr level is
less than or equal to what?

A

<313F is 592#
Restore in 8 hours or verify pzr level
≤100”

59
Q

If LTOP not in effect, PORV min
setpoint is what pressure? Restore
in how much time OR shut what OR
shut and remove power from PORV
OR be in what in how much time
and CSD in how much time?

A

PORV min setpoint is #2425
Restore in 8 hours OR
Close block valve OR
Close and remove power form PORV
OR
Be in hotstandby in 6 hours and CSD
in 30 hours

60
Q

When RCS is less than what temp,
PORV shall NOT be taken OOS or
isolated unless HPI pumps racked
OUT, MUV-what Closed w/ bkrs to
what position and MU-V-what
Closed/open or RX head off.

A

<313F
MUV-16’s
Breakers open (MUV-16)
MUV 217 closed

61
Q

PORV clock valve shall be
OPERABLE during hsby, s/u and
power ops. If INOPERABLE, restore
in how much time or close what and
remove power OR be in hsby in how
much time and CSD in how much
time?

A

Restore in 1 hour OR
Close PORV (verify closed) And
Remove power OR
Be in hsby in 6 hours or CSD in 30
hours.

62
Q

PORV tech spec
Design basis

A

Prevents overpressure by eliminating
high pressure sources or assuring RCS
open to atm. Block valve required to
provide isolation of PORV to control
potential RCS depressurization

63
Q

PORV
NDTT Switch
Two position switch located on PC which
changes PORV setpoint for LTOP concerns
when RCS is less than what temp? in off
setpoint is what? In auto position the OPEN
setpoint to what pressure and Close at what
pressure when Tcold is < what?

A

RCS <313F
In OFF setpoint is #2450
In Auto open is #592 and close at #542
when Tcold <313F

64
Q

PORV
Other
NDTT switch kept OFF because a single failure
of WR Tcold instrument LOW would cause the
PORV to OPEN. Per 1101-11, we place NDTT
switch to what position after RCS< what temp
and prior to RCS < what temp?

A

Place NDTT switch in Auto after
RCS<565F and prior to RCS <313F

65
Q

PORV isolation valve (RC-V-2)
Type of valve and Power supply

A

MOV, a D-ring top of pzr
1C ES valves MCC

66
Q

Most important pzr level mile stone

A

370”
Enter AOP-43 loss of pressurizer and
trip RX

67
Q

Porv acoustic monitors (2 channels)
Located on valve body, indicates if PORV is
OPEN, alarm annunciator at how many G’s (%)

A

0.3G’s (5%)

68
Q

Tail pipe (delta P)(3 channels)
1 for PORV, 2 for code safeties
Indication on CC, how many inches delat p
alarm setpoint (%)

A

20” delta P alarm setpoint (5%)

69
Q

Tail Pipe delta P (3 channels)
T.S. 3.5.5 accident monitoring requires how
many channels, how many minimum?

A

2 channels with 1 minimum