QUIZ: Balancing Ops - Manual 12 - Final Assessment Flashcards

1
Q
  1. TLR stands for?

a. Transmission loading relief
b. Transmission line reload
c. Transmission line relief
d. Transmission lead relief

A

a. Transmission loading relief

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  1. PJM dispatching operations are conducted from how many control centers?

a. One
b. Two
c. Three
d. Four

A

b. Two

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  1. There are two general types of market buyers; internal market buyers and external market buyers.

a. True
b. False

A

a. True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  1. A market buyer that is making purchases of energy from the PJM energy market for consumption by end-users that are located outside the PJM RTO describes?

a. Internal market buyer
b. External market buyer
c. After market buyer
d. Discount buyer

A

b. External market buyer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  1. EMS stands for?

a. Energy management system
b. External management system
c. Exterior management system
d. Extra management system

A

a. Energy management system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  1. The Security Analysis (SA) program runs approximately how often?

a. 10-30 seconds
b. 30-60 seconds
c. 1-2 minutes
d. 5-10 minutes

A

c. 1-2 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  1. The Transfer Limit Calculator (TLC) runs approximately how often and establishes transfer limits for selected interfaces on the PJM system?

a. 30-60 seconds
b. 1-2 minutes
c. 4-5 minutes
d. 8-10 minutes

A

c. 4-5 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  1. What tool enables PJM dispatchers to manage resource information, transmission constraint information and administer the regulation market?

a. Dispatch Management Tool (DMT)
b. Distribution management tool
c. Dispatch misinformation tool
d. Domestic management tool

A

a. Dispatch Management Tool (DMT)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  1. What is an internet based system that allow communication of system information between PJM and member company dispatchers?

a. EMS
b. eDart
c. AGC
d. IT

A

b. eDart

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  1. What is a program used to schedule and optimize hydro generating resources located on the Susquehanna River?

a. Resource calculator
b. Hydro calculator
c. Generation calculator
d. Resource optimizer

A

b. Hydro calculator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  1. All interchange transactions are modeled in the IDC and the IDC calculates flow impacts of these transactions on each?

a. Flowgate
b. Line
c. Transformer
d. Substation

A

a. Flowgate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  1. An internet based system used to exchange operating information among reliability coordinators and balancing areas is called the?

a. ITT
b. RCIS
c. RC database
d. eTAG

A

b. RCIS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  1. According to PJM, how many types of emergency messages can be received?

a. Two
b. Three
c. Four
d. Five

A

c. Four

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  1. What is a measure of the imbalance between sources of power and used of power within the PJM RTO?

a. Area control error
b. Imbalance
c. Inadvertent
d. Inertia

A

a. Area control error

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  1. The sign convention for power flow used at PJM is positive for power flow into PJM, in contrast to the NERC sign convention, in which power flow into a balancing area is negative.

a. True
b. False

A

a. True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
  1. How many modes of control are available to the PJM dispatcher for the operation of the PJM RTO?

a. One
b. Two
c. Three
d. Four

A

c. Three

17
Q
  1. Which form of control is unavailable to the dispatcher of the PJM RTO?

a. Flat frequency control
b. Flat tie line control
c. Flat control
d. Tie line bias control

A

c. Flat control

18
Q
  1. What is the most widely used mode of control for multi-balancing area power systems?

a. Flat frequency control
b. Flat tie line control
c. Tie line bias control
d. Flat control

A

c. Tie line bias control

19
Q
  1. What defines a standard of minimum control performance for each balancing area?

a. DCS
b. CPS
c. RAS
d. APS

A

b. CPS

20
Q
  1. The DCS states that ACE must return either to zero or to its pre-disturbance level within how many minutes following the start of the disturbance?

a. 5 minutes
b. 10 minutes
c. 15 minutes
d. 30 minutes

A

c. 15 minutes

21
Q
  1. Each balancing area must achieve CPS1 compliance of?

a. 25%
b. 50%
c. 75%
d. 100%

A

d. 100%

22
Q
  1. Each balancing area must achieve CPS2 compliance of?

a. 60%
b. 70%
c. 80%
d. 90%

A

d. 90%

23
Q
  1. Unless there is a time error correction in progress, frequency should be maintained at how many Hz?

a. 50Hz
b. 55Hz
c. 60Hz
d. 65Hz

A

c. 60Hz

24
Q
  1. The difference between hourly net actual interchange and hourly net scheduled interchange of a balancing authority is called?

a. Hourly inadvertent interchange
b. Hourly interchange difference
c. Hourly cost
d. Hourly interchange

A

a. Hourly inadvertent interchange

25
Q
  1. Who is responsible for monitoring and adjusting the reserves to ensure compliance with NERC, SERC, and RFC BAL standards for the PJM balancing area?

a. NERC
b. FERC
c. PJM
d. MISO

A

c. PJM

26
Q
  1. Resource owners wishing to provide regulation in the PJM balancing area are required to submit the following data via eMKT no later than?

a. 08:00 day of
b. 08:00 day ahead
c. 18:00 day ahead
d. 18:00 day of

A

c. 18:00 day ahead (CHECK)

27
Q
  1. PJM obtains the most cost efficient regulation ancillary service available, as needed, to meet the PJM RTO’s regulation requirement

a. True
b. False

A

a. True

28
Q
  1. The AR test is run during a continuous period when, in the judgment of PJM test administrator, economic or other conditions do not otherwise change the base loading of the resources that are being tested. How long is that period?

a. 15 minutes
b. 30 minutes
c. 40 minutes
d. 60 minutes

A

c. 40 minutes

29
Q
  1. Generators that commit to provide black start service shall not have their black start capable designation terminated within the time of their commitment. PJM shall provide how much notice prior to terminating the black start service of the unit?

a. 6 weeks
b. 6 months
c. 1 year
d. 2 years

A

d. 2 years