1
Q

How do you measure steel?

A

Tonnage (T)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How are doors measured?

A

Count / number

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How are walls measures?

A

M2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is GEA?

A
  • Total area of building from external face of perimeter wall
  • Excludes balconies
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is GIA?

A
  • Total area inside internal perimeter wall face
  • excludes voids
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is NIA?

A
  • Rentable area of a building
  • excludes columns, cores and height below 1.5m
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is comp 6?

A

Code of Measuring Practice 6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is IPMS?

A

International Property Measuring Standards

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Why do we have measurement standards?

A
  • All work is consistent around the world
  • provides guidance on ways to do things correctly
  • ensuring right and wrong
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the key differences between IPMS and COMP 6?

A

IPMS 1 - GEA = IPMS includes balconies
IPMS 2 - GIA = IPMS includes balconies
IPMS 3 - NIA = IPMS includes columns and internal dominant face of over 50% of wall covering.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is CostX?

A

A digital software that allows you to measure and cost for building project from drawings.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is revit?

A

A BIM software tool that can be used to design buildings and see as a 3D model.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the advantages of using online softwares?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the hot rates internal database?

A

An in house document where be it all different rates are provided from recent tenders to ensure rates we are using are up to date for each package and items we use.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What was included in the WC package you produced a PTE for?

A
  • floor finishes
  • wall finishes
  • ceiling finishes
  • FFE
  • Sanitarywate
  • internal walls
  • internal doors
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What was included in the Soft strip package you produced a PTE for?

A
  • Removal of internal partitions and doors
  • removal of heritage wall finishes and protection for reincorporation
  • protection to heritage finishes
  • prelims
  • removal of stair balustrades
  • removal of MEP
  • Asbestos removal
17
Q

What was included in your area schedule for the tall building?

A
  • Basis, assumptions and exclusion
  • areas for NIA, GIA and GEA
  • N:G efficiency
18
Q

What is N:G?

A
  • Net : Gross Efficiency
  • NiA in comparison to total area
19
Q

What is typical N:G for Commerical building?

A
20
Q

What was included in facade PTE?

A
  • Prelims
  • PCSA
  • measured works of each facade type
  • external doors
  • euro : pound rate
  • VE options
21
Q

What is a tender analysis?

A

A comparison of tender returns and our PTE

22
Q

What is normalization?

A

Process of making sure all tenders are on a level playing field and tendered for everything
- highest rate
- PTE rate
- average rate of other returns

23
Q

How would you measure works on site that the contractor applied for?

A
  • Look at what has been applied for
  • go to site and look at the works
  • can measure on site if necessary
  • will make an assessment using drawings of proposed works
  • agree with contractor what is fair and reasonable
24
Q

How could the client increase NIA on building?

A
  • reduce size of cores and columns
  • reduce depth of facade
25
Q

What does dominant face mean?

A