Project Management - Project Life Flashcards
PROJECT BEGINING
OWNER PROVIDES
1 / Surveys
2 / Legal description
3 / Program
4 / Pay Approvals, Assessment, etc.
5 / Financial Evidence for Project Budget
6 / Insurance (G715 Cert. of Insurance)
7 / Copies of Drawings and Specifications for CONTRACTOR
INSURANCE REQ
OWNER
1 / PROPERTY 2 / WORKERS COMP 3 / GENERAL LIABILITY 4 / PERSONAL INJURY 5 / PROPERTY DAMAGE 6 / AUTOMOBILE LIABILITY 7 / CONTRACTUAL LIABILITY
ARCHITECT’S PARTICIPATION
BIDDING PROCESS
1 / compile a list of prospective bidders
2 / obtain competitive/negotiated bids
3 / prepare and award contracts for construction
4 / evaluate successful bid
ARCHITECT
SUPPLEMENTAL SERVICES
1 / PROGRAMMING 2 / SURVEYS 3 / RECORD DRAWINGS 4 / ASSIST WITH PUBLIC HEARINGS 5 / FINANCIAL FEASIBILITY STUDIES 6 / DETAILED ESTIMATES 7 / MOCK-UPS 8 / RE-DESIGN BY A CHANGE IN PROJECT SCOPE
ARCHITECT
BASIC SERVICES
1 / SCHEMATIC DESIGN 2 / DESIGN DEVELOPMENT 3 / CONSTRUCTION DOCUMENTS 4 / BIDDING NEGOTIATION 5 / CONSTRUCTION ADMINISTRATION 6 / Structural, Mechanical, and Electrical Engineering
COST ESTIMATING METHODS
1 / Area/Volume or Unit Cost Method at Pre-Design
2 / Subsystem Method at SD
3 / Quantity Survey Method at DD
QUANTITY SURVEY METHOD
COST ESTIMATING
an extremely detailed approach that involves calculation for each component of a building
such as lengths of all wiring and duct runs
listing items such as trim cover plates
prices are assigned to each material and include allowances, labor, time, overhead, and profit
MASTER FORMAT:
FACILITY CONSTRUCTION SUBGROUP
DIVISIONS: 02 EXTG COND 03 CONC 04 MASONRY 05 METALS 06 WD, PLASTICS, AND COMP 07 THERMAL AND MOISTURE PROTECTION 08 OPENING 09 FINISHES 10 SPECIALTIES 11 EQUIPMENT 12 FURNISHINGS 13 SPECIAL CONST 14 CONVEYING EQUIPMENT 15 - 19 [RESERVED FOR FUTURE EXPANSION]
MASTER FORMAT:
FACILITY SERVICES SUBGROUP
20 [RESERVED] 21 FIRE SUPPRESSION 22 PLUMBING 23 HEATING, VENT, AC 24 [RESERVED] 25 INTEGRATED AUTOMATION 26 ELECTRICAL 27 COMMUNICATIONS 28 ELECTRONIC SAFETY AND SECURITY 29 [RESERVED]
MASTER FORMAT:
SITE AND INFRASTRUCTURE SUBGROUP
30 [RESERVED] 31 EARTHWORK 32 EXTERIOR IMPROVEMENTS 33 UTILITIES 34 TRANSPORTATION 35 WATERWAY AND AMRINE CONST 36 - 39 [RESERVED]
MASTER FORMAT:
PROCESS EQUIPMENT SUBGROUP
40 PROCESS INTEGRATION
41 MATERIAL PROCESSING AND HANDLING EQUIP
42 PROCESS HTG, COOLING DRYING EQUIP
43 PROCESS GAS AND LIQUID, PURIFICATION, STORAGE EQUIP
44 POLLUTION AND WASTE CONTROL EQUIP
45 INDUSTRY-SPECIFIC MANUFACTURING EQUIP
46 WATER AND WASTEWATER EQUIP
47 [RESERVED]
48 ELECTRICAL POWER GENERATION
49 [RESERVED]
MASTER FORMAT DIVISION
3 SECTIONS PER
1 / General (deals with scope)
2 / Materials (describes the materials)
3 / Execution (describes installation)
TARGET VALUE DESIGN (TVD)
The Lean Construction and IPD community, Design-Build
often utilizes UNIFORMAT at beginning
costing as a practice that incorporates cost as a factor in design to minimize waste and create value - target cost should never be exceeded. Cost drives design instead of design driving cost.
UNIFORMAT MAJOR GROUP ELEMENTS
A / SUBSTRUCTURE B / SHELL C / INTERIORS D / SERVICES E / EQUIPE AND FURNISHINGS F / SPECIAL CONST AND DEMO
INSURANCE REQUIRED FOR CONTRACTOR
1 / WORKERS COMP 2 / GENERAL LIABILITY 3 / PROPERTY DAMAGE (for adj properties) 4 / AUTOMOBILE LIABILITY 5 / CONTRACTUAL LIABILITY
G715 determines req insurance be purchased before commencement of the work