Programming and Analysis Flashcards

1
Q

What are the different types of floor area measurements/

A

Go RUN

Gross (Code & Programming)
Rentable
Usable
Net

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the different between Gross Floor Area for code purposes and programming purposes?

A

Gross Floor Area for CODE does not include the exterior wall area

Gross Floor Area for PROGRAMMING does include the exterior wall area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is Rentable floor area?

A

Gross floor area excluding stairs and elevators

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is Usable floor area?

A

Rentable floor area excluding lobbies and lavs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is Net floor area?

A

Usable floor area excluding shared corridors

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the problem with re-entrant corners in seismic zones

A

Each portion of the building twists out of phase with the other

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the 3 S’s for dealing with re-entrant corners in seismic zones?

A

Separate
Stiffen
Strengthen

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is loam?

A

A soil that contains sand, silt and clay.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Can loam soil support a building?

A

Yes - it is competent enough to support a building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What type of soil can support a building?

A

Gravel, clay, shale and sand or ‘OK’

Rock (bedrock, limestone, sandstone) are best

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What type of soil cannot support a building?

A

Peat and organic soil

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is ‘ net present value’?

A

An aspect of life cycle cost analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are ASTM E 1527 and ASTM E 1903 standards for?

A

ESA Phase I and ESA Phase II

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What does ASHRAE 55 cover?

A

Thermal comfort

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What does ASHRAE 62 cover?

A

Ventilation and IAQ

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What does ASHRAE 90.1 cover?

A

Energy and lighting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What is a detention pond?

A

Holds water during a storm and lets it seep back out slowly. Only wet during a storm. Dry inbetween.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What is a retention pond?

A

Holds water during and storm and is always wet.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What is a bioswale?

A

Ecologically thought through detention pond.

It is essentially a vegetated detention pond.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

What is a cistern?

A

Underground containers for paving runoff of roof runoff.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

What is “bank-measure”?

A

Amount of earth in it’s natural state

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What is “loose-measure”?

A

Amount of earth in transport

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What is “compacted-measure”?

A

Amount of earth compacted

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

What is shrink and swell state a factor of?

A

Bank measure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

What is the angle at which we change the position of a PV on a roof to optimize it for either summer or winter?

A

15 degrees

26
Q

What is the angle at which we modify solar orientation calculations in solar studies?

A

23.5 degrees

27
Q

Do we lower or raise a PV by x degrees for summer months?

A

Lower by 15 degrees

28
Q

Do we lower or raise a PV by x degrees for winter months?

A

Raise by 15 degrees

29
Q

When should you use horizontal louvers?

A

When shading the south side of a building

30
Q

When should you use vertical louvers?

A

When shading the east and west side of a building

31
Q

What is the minimum slope for swales to prevent standing water?

A

1% or 1/100

32
Q

What is the maximum cross slope for ADA walkways?

A

2% or 1/48

33
Q

What is the maximum slope for accessible ramps?

A

1/20 or 5%

34
Q

What is unique about a civil engineer?

A

They can be hired by either Architect or Owner.

Unlike Geotech which is always hired by the owner

35
Q

What is riprap?

A

Large boulders and rocks used for erosion control

36
Q

What is the plastic limit?

A

% of moisture at which soil goes from solid to sqiushy

37
Q

What is the water limit?

A

% of moisture at which soil becomes liquid

38
Q

What is phytoremediation?

A

Using plants in the ground to aid in the breakdown of SVOCs.

Slow

39
Q

What is soil vapor extraction?

A

Wells dug into ground and the VOCs are vacuumed out via a pump above ground.

40
Q

What is a benefit to soil vapor extraction?

A

It can occur while the site is occupied

41
Q

What is bioremediation?

A

Injection of micro-organisms into the ground to aid in the breakdown of VOCs, SVOC and inorganic materials

42
Q

What is the mnemonic we use for remembering crime prevention?

A

Sure, Volvo cars look truly exquisite, Violet

43
Q

What are the measures for enacting good crime prevention?

A

Sure, Volvo cars look truly exquisite, Viola

Surveillance (passive and active)
Visibility
Community
Lighting
Traffic-calming
Escape route planning
Vandal-proof

44
Q

What are the 3 main tenants of defensible space design?

A

SAT

Surveillance
Access
Territory

45
Q

How many SF are in an acre?

A

43,560

4 down 1 to 3
5 up 1 to 6

Or 66 * 660

Or 7-11

46
Q

Fastest to slowest soil remediation technique?

A

ACAB VP

Remember A = O

Off-site soil washing
Capping (gay)
On-site soil washing
Bioremediation
Vapor extraction
Phyto

47
Q

Steepest slope for parking lots?

A

5% maximum

1% minimum for run off

48
Q

Steepest slope for planted areas?

A

50% slope, or 2:1

49
Q

What is the max slope (percentage, ration and degrees) before a step footing is required?

A

10%

1:10

6 degrees

50
Q

What is the max slope (percentage, ratio and degrees) for a driveway?

A

1:4

25%

14 degrees

51
Q

What is the max slope (percentage, ratio and degrees) for a green roof?

A

1:1

100%

45 degrees

52
Q

How far apart are boring holes?

A

20 paces typical for a multi-story building

53
Q

What is “unit-in-place” valuatoin?

A

What it would cost to replace a building if it disappeared tomorrow

54
Q

What is “historical cost approach”?

A

Assume it’s still worth what you paid for it 15 years ago

55
Q

What is the difference between “unit-in-place” and “unit rate”?

A

Unit-in-place is more for property valuation

Unit rate is for estimating a project at DD or CD

56
Q

How much might a “ROM” be off by?

A

2x

57
Q

When to use soil solidification/stabilization?

A

Inorganic and radioactive pollutants

EG - toxic heavy metals, pesticides and fertilizers

58
Q

When to use soil washing / soil flushing?

A

Inorganic materials

59
Q

When to use soil vapor extraction?

A

Fuels and underground VOCs

60
Q

When to use bioremediation?

A

VOCs, fuels, inorganics (toxic metals) and explosives