Practice Exam #4 1-8 Flashcards

1
Q

You are providing job coverage for workers inside the containment building repairing a transmitter while the reactor is at full power. The gamma dose rates in the area is 100 mrem/hr gamma and 40 mrem/hr neutron. Based on those dose rates, what would you expect the workers to pick up in 10 minutes. Assume the field is uniform.

A

23.33 mrem

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

You are providing job coverage for workers and their EAD dose set point is 200 mrem. The RWP says they have to exit the building when they reach 80% of
their EAD dose set point. They are working in a uniform dose field of 80 mrem/hr gamma. How long can they stay in this area and work?

A

2 Hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Worker have been repairing a valve seat inside the containment building while the reactor is operating. The general area dose rate is 30 mrem/hr gamma and 4
mrem/hr neutron. The RWP has set a stay time of 45 minutes in the area. If the workers stay the full 45 minutes what would their exposure be?

A

25.5 mrem

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What would be the total dose to a worker if he was working in an area where the
gamma dose rate was 200 mrem/hr and the airborne concentration from iodine-
131 was 2 DAC. Assume the worker stayed in the area for 2 hours.

A

410 mrem

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

If the RWP set a dose limit of 350 mrem for an entry into a steam generator, and assuming the dose gradient is uniform, how long could a worker stay in the area if the gamma dose rate was 12.2 rem/hr? Put your answer in minutes

A

1.72 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Which of the following is a fission product barrier for either a BWR or PWR reactor design?

A

Fuel cladding

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

In a Boiling Water Reactor, BWR, the turbine is contaminated. This is a result of water being boiled in the core, sent through moisture separators and dryers, and then into the turbine. True or False?

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

In determining the statistical operation of a counting instrument, if the counts are close to the mean value, which of the following statements is correct?

A

The curve will be higher and steep and have a low numerical value for the standard deviation acceptance criteria.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly