Prac GC3 Flashcards
The third phase of an architect’s regular services
Contract documents phase
Project financing falls under what kind of service of the architect.
Pre-design services
Comprehensive planning falls under what service of the architect
Specialized allied services
The fee of the architect for design-build services on a guaranteed maximum cost aside from his fee for regular design services.
10%
What percentage of an architect’s work is liability under the civil code?
10%
For interior design services, the architect shall be paid what percentage of the fee upon submission of the final design?
50%
When the owner fails to implement the plans and documents for construction as
prepared by the architect, the architect is entitled to receive what percentage of his fee?
85%
The minimum fee per appearance of an architect when rendering service as an expert witness shall be __.
Php500
The minimum basic fee for specialized decorative building.
12%
The minimum basic fee for industrial buildings with a project cost below 50 million pesos.
6%
The minimum basic fee for hospitals with a project cost below 50 million pesos.
8%
In design-build services, the single-point-responsibility of project delivery puts the legal liability for both the design and construction on the ___.
Architect
The release of 10% retention by the owner shall be done after how many months from the date of final payment.
3 months
Printed documents stipulating the procedural and administrative aspect of the contract.
General conditions
An outline specification enumerating the type and trade names of materials to be used.
Schedule of material and
finishes
A price is given by a contractor, sub-contractor, material supplier or vendor to furnish materials, labour or both.
Quotation
A statement from the architect confirming the amount of money due to the contractor for work
accomplished.
Certificate of payment
A bond furnished by the contractor and his surety as a guarantee to execute the work in accordance with the terms of the contract.
Performance bond
An offer to perform the work prescribed in a contract at a specified cost.
Bid
The fee of the architect for design-build services by administration.
7%
A stipulation of the use of specific products or processes without provision for substitution.
Closed specification
A list of instructions stipulating the manner in which bids are to be prepared.
Instruction to bidders
The performance and Payment Bonds shall be released by the owner after the expiration of how many months from the final acceptance of the work?
2 months
The Guarantee Bond is released how many months after the date of final payment.
12 months / 1 yr
How many days shall the Building Official issue a certificate of occupancy after final inspection of the project?
30 days
A statute specifying the period of time within which legal action must be brought for alleged damage or injury.
Statute of Limitation
A bond, the form or content of which is prescribed by statute.
Statutory Bond
A rule that certain kinds of contracts are enforceable unless signed and in writing or unless there is a written memorandum of their terms signed by the party to be charged.
Statute of Frauds
A contract transferring the right of possession of buildings, property, etc., for a fixed period of time, usually for periodical compensation called ‘rent’.
Lease
A tenure by lease; real estate held under a lease.
Leasehold
The person receiving a possessory interest in buildings, property, etc., by lease.
Lessee
The person granting a possessory interest in buildings, property, etc., by lease.
Lessor
Range of the multiplier for Multiple of Direct Personnel Expense.
2-2.5
This type of compensation is only applied to non-creative work.
Multiple of Direct Personnel Expenses
Supervision Work is a non-creative work, true or false
TRUE
A worldwide used method of compensation for architectural services.
Percentage of Construction Cost
This method of compensation is applied only to pre-design services, supervision work, and other works which the Architect may perform other than the regular and specialized allied services.
Multiple of Direct Personnel Expenses
This type of compensation is similar to the concept being charged by realtors, developers, and lawyers.
Percentage of Construction Cost
For reimbursable expenses, how many kilometres from the Architect’s office shall work be located to allow reimbursable expenses?
50 kms
This method of compensation is frequently used where there is a continuing relationship on a series of projects.
Professional Fee Plus Expenses
The full-time construction inspector shall be under the technical control and supervision of
the ___.
Architect
Submission of shop drawings shall be accompanied by a ___ in duplicate.
Letter of transmittal
How many sets of shop drawings for approval shall the contractor submit to the Architect?
3
Who shall have the responsibility of securing, but not liable for non-issuance, of the final occupancy permit?
Contractor
True or false: Can the owner relegate to the contractor the responsibility of establishing the lot lines, boundary lines, easements, and benchmarks provided that the owner pays
the contractor for such works?
TRUE
Who shall have the responsibility for establishing lot lines, boundary lines, easements, and benchmarks?
Owner
Who shall pay for the services of a licensed surveyor for confirmation and certification of the location of column centres, piers, walls, pits, trenches, pipework, culvert work, utility lines, and other similar works required by the contract?
Contractor
Professional Fee for the Architect as a full-time supervisor
1-1.5%
Professional fee for the Construction Manager.
1.5-3%
Four types of Contracts for construction management
Firm Fixed Price
Fixed Price Incentive
CPIF / CPAF
Cost Plus Fixed Fee
Under PD 1096, what should be the proportion of sidewalk width to that of the road right-of-way?
1/6
At what interest rate per month should a client pay the architect should the former fail to pay the latter beyond 30 days from receipt of billing?
2%
What code holds the architect responsible for the building/structure he designed for a certain period of time?
Civil Code
What type of compensation is applied to cases where the architect’s personal time is required, such as conferences, joint venture activities, etc.?
Per Diem+Reimb. Expenses
What type of bond guarantees payment on all obligations arising from the contract?
Payment Bond
What type of compensation is applied to most of the Gov’t projects and entails more paper works and is advantageous to both client and architect?
Lump-Sum / Fixed Fee
Professional Fee for the Project Manager.
2-5%
If the Project Manager is hired by the owner, who shall have the responsibility of hiring the Construction Manager?
Project Manager
True or false: Based on the Civil Code, the Project Manager has no legal responsibility insofar as design and construction is concerned.
TRUE
His primary responsibility is the exercise of overall cost control which relieves the owner of many of the anxieties that usually beset, particularly those concerned with forecasting cost and completion dates.
Project Manager
In the architect’s code of ethics, to whom does the architect has the responsibility to seek opportunities for constructive service in civic and urban affairs?
Public / People
What PD created the PRC which regulates the practice of various professionals?
PD 223
Architect XYZ uses paid advertisements without sanction by professional consensus and years of experience. His action is unethical with respect to his relation to whom?
People / Public
Additional information on contract documents issued to bidders before the date of bidding.
Bid Bulletin
The offer of a bidder to perform the work described by the contract documents when made out and submitted on the prescribed proposal form, properly signed and sealed.
Proposal
The cashier’s check or surety bond accompanying the proposal submitted by the bidder, as a guarantee that the bidder will enter into a contract with the owner for the construction of the work if the contract is awarded to him.
Proposal Bond
Instructions which may be issued prior to the bidding to supplement and/or modify drawings, specifications, and/or general conditions of the contract.
Special provisions
Written or printed description of work to be done describing qualities of material and mode of construction.
Specifications
Means information, advice or notification pertaining to the project delivered in person or sent by registered mail to the individual, firm or corporation at the last known business address of such individual, firm or corporation.
Written Notice
Includes labour or materials or both as to equipment, transportation, or other facilities necessary to commence and complete the construction called for in the contract.
Work
Means to build-in, mount in position, connect or apply any object specified ready for the intended use.
Install
Means to purchase and/or fabricate and deliver to Jobsite.
Furnish
Means to furnish and install.
Provide
No further retention shall be made on the balance of the contract when how many per cent of the contract has been completed?
50%
No payment shall be made on contracts in excess of how many percents of the contract price?
65%
The guarantee bond is equal to how many per cent of the contract price?
30%
How many per cent of the architect’s fee is payable to the architect upon completion of the preparation of the schematic design phase and up to final design development phase?
30%
Standard factor computed for changes and/or revisions made on completed contracts.
2.5
Approximately, how many square meters of office space for the architect is built by the contractor as temporary facilities for the project?
12 sqm.
All trees and other plants that need to be transplanted elsewhere within ___ meters shall be done by the ___ at his own expense.
Contractor
If there is a variance/discrepancy between the drawings and specifications, what shall be followed?
Specifications
How many days prior to bidding shall the contractor seek the architect’s clarification as to the particular areas of work which requires evaluation of the architect?
15 Days
How many days upon written notice can a contractor terminate a contract with a valid reason?
15 Days
Suspension of work for ___ days by order of any court or other public authority through no act or fault of the contractor gives him the right to terminate the contract.
90 Days
True or false: The contractor can terminate the contract if the owner should fail to pay the
contractor any sum within 15 days after its award by the arbitration.
False (30 days)
True or false: The contractor can terminate the contract if the owner should fail to act upon any request for payment within 30 days after its certification by the architect.
False (15 days)
Who declares bankruptcy as a valid reason for the termination of a contract?
Contractor
True or false: Upon the termination of contract and upon the decision of the architect that materials and equipment left by the contractor which do not belong to him can be used and rent of such shall be borne by the failing contractor.
TRUE
True or false, in case of suspension of work, all unpaid work executed including expenses incurred during suspension shall be evaluated by the architect and charged to the owner.
TRUE
True or false: The owner has no right to claim liquidated damages if he takes over the work from the contractor for failure to complete the project.
FALSE
How many days prior to cancelling insurance be given to the owner stipulating the intention to cancel?
10 days
How many per cent of the contract amount is the Performance Bond?
15%
How many per cent of the contract amount is the Payment Bond?
15%
A contract provision setting forth the damages a party must pay in the event of his breach
Penalty Clause
Basic Fee for Physical Planning Type 1 or site such as industrial estates, commercial centres, sports complex, resorts, etc.
5,000 for First 50 Hectares
The predecessor of PD 1096
R.A. 6451
What presidential decree institutionalized the profession of environmental planning?
PD 1308
It is right enforceable against specific property to secure payment of an obligation.
Liens
The minimum basic fee for simple projects.
6%
The minimum basic fee for alterations/renovations.
MBF + 50%MBF
When the architect is engaged to render an opinion or advise, clarification or explanation on technical matters pertaining to his profession, the minimum basic fee shall be ___.
200 / hr
When rendering service as an expert witness, the architect is compensated ___/ hr.
500
The minimum basic fee for Group 5 Projects (monumental).
12%
What is Group 6 Project classification?
Repetitive Construction
The minimum Basic fee for housing projects.
10% of the 1st unit
60% 2nd-10th Unit
30% 11th and above
Under what classification of Project do Hospitals and Medical Buildings fall?
Group 3 (Exceptional Character)
Under what classification of Project does Stadium fall?
Group 3 (Exceptional Character)
Minimum Per diem paid to the architect if work is beyond 50 km. from office.
PHP 750.00
On the remaining 15% work fee of the architect, where does the 5% go?
Construction Phase Service
Repairs and corrective works at the expense of the contractor should be done within how many days after written notice by the owner?
5 days
Failure on the part of the contractor to remove condemned work shall give the owner the right to remove said work at contractor’s expense and contractor shall pay the owner the expenses incurred within how many days from removal by the owner of said work?
10 days
Contract time reckoning shall commence on the ___ from receipt of ___.
7th day / Notice to Proceed
An area of a city where municipal buildings are grouped.
Civic Center
Any article of property not consisting of or affixed to land plus any interest in land that is less than a freehold.
Chattel
No person who is not a citizen of the Philippines may take the board exams or practice the profession unless the country of his relation allows the same ___.
Reciprocity