The third phase of an architect’s regular services
Contract documents phase
Project financing falls under what kind of service of the architect.
Pre-design services
Comprehensive planning falls under what service of the architect
Specialized allied services
The fee of the architect for design-build services on a guaranteed maximum cost aside from his fee for regular design services.
10%
What percentage of an architect’s work is liability under the civil code?
10%
For interior design services, the architect shall be paid what percentage of the fee upon submission of the final design?
50%
When the owner fails to implement the plans and documents for construction as
prepared by the architect, the architect is entitled to receive what percentage of his fee?
85%
The minimum fee per appearance of an architect when rendering service as an expert witness shall be __.
Php500
The minimum basic fee for specialized decorative building.
12%
The minimum basic fee for industrial buildings with a project cost below 50 million pesos.
6%
The minimum basic fee for hospitals with a project cost below 50 million pesos.
8%
In design-build services, the single-point-responsibility of project delivery puts the legal liability for both the design and construction on the ___.
Architect
The release of 10% retention by the owner shall be done after how many months from the date of final payment.
3 months
Printed documents stipulating the procedural and administrative aspect of the contract.
General conditions
An outline specification enumerating the type and trade names of materials to be used.
Schedule of material and
finishes
A price is given by a contractor, sub-contractor, material supplier or vendor to furnish materials, labour or both.
Quotation
A statement from the architect confirming the amount of money due to the contractor for work
accomplished.
Certificate of payment
A bond furnished by the contractor and his surety as a guarantee to execute the work in accordance with the terms of the contract.
Performance bond
An offer to perform the work prescribed in a contract at a specified cost.
Bid
The fee of the architect for design-build services by administration.
7%
A stipulation of the use of specific products or processes without provision for substitution.
Closed specification
A list of instructions stipulating the manner in which bids are to be prepared.
Instruction to bidders
The performance and Payment Bonds shall be released by the owner after the expiration of how many months from the final acceptance of the work?
2 months
The Guarantee Bond is released how many months after the date of final payment.
12 months / 1 yr