Old Prac Board Exam Flashcards
Which of the following conditions describe the design-build services on guaranteed maximum cost?
- 10% maximum excess over guaranteed maximum cost
- Savings on project construction cost divided equally between the architect and the client
- 10% excess of guaranteed maximum cost divided equally between the architect and the client
- More than 10% excess of the guaranteed maximum cost paid by the architect
- All items listed
a. 1, 2, 3
b. 2, 3, 4
c. 1, 3, 4
d. 5
c. 1, 3, 4
Which of the following describe promotional services?
a. Design preparation to generate financial support
b. Material specifications
c. Space use analysis/space module design
d. Client’s needs assessment
a. Design preparation to generate financial support
Which of the following specialised allied services describes landscape design?
a. Master Development Planning
b. Furniture layout/provision of fixtures and decorative items
c. Sound control design/electronics and communications systems
d. Land use/sitting of buildings and communication routes
a. Master Development Planning
Under what phase of design services does the architect assist the owner in securing required documents from appropriate government authorities?
a. Contract Documents
b. Design Development
c. Construction
d. Schematic Design
a. Contract Documents
In the Architect’s Code of Ethics, to whom does the architect have the responsibility to give every reasonable aid for a full understanding of contract documents?
a. Manufacturers/Dealers
b. Public
c. Contractor
d. Client
c. Contractor
What type of specifications indicates the description of the product itself?
a. Descriptive
b. Brand Name
c. Closed
d. Performance
c. Closed
Which of the following describes architectural programming?
a. Site Analysis for potential Development
b. Determines Space Requirements
c. Analyses Development Costs
d. Determines Client’s Needs/Assessments
b. Determines Space Requirements
What project management tool consists of identifying the most critical set of activities and computes critical path schedules for implementation?
a. Gantt Chart
b. Project Breakdown Structure
c. Networking Analysis
d. Critical Path Method
d. Critical Path Method
There are seven categories of architects’ services, under what category does architectural programming fall?
a. Specialised Allied Services
b. Construction
c. Design
d. Pre-design
d. Pre-design
In the architect’s range of services, under which services does acoustics fall?
a. Pre-design
b. Specialised Allied
c. Design
d. Post-construction
b. Specialised Allied
Which of the following post-construction services includes the evaluation of the functional effectiveness of the plans?
a. post-construction evaluation
b. owner’s association organisation
c. building/equipment maintenance
d. building/grounds administration
a. post-construction evaluation
In the architect’s design services, under which phase does the architect make periodic visits to the project site to familiarise himself with the general progress/quality of the work?
a. Design Development
b. Construction
c. Schematic Design
d. Contract Documents
b. Construction
In the formulation of the Master Development Plan, which component is concerned with the locality’s assets and management?
a. physical
b. transport
c. economic
d. socio-cultural
c. economic
There are seven categories of architects’ services, under what category does utilisation and land-use studies fall?
a. Specialised Allied Services
b. Construction
c. Design
d. Pre-design
d. Pre-design
Within what period may contractor after giving written notice to owner/architect suspend work/terminate contract?
a. 15 days
b. 21 days
c. 10 days
d. 30 days
c. 10 days
In a typical owner-general contractor agreement, who is responsible for payment of insurance for personal injury and property?
a. project manager
b. architect
c. owner
d. contractor
d. contractor
Under PD1096, what is referred to as construction is an existing building/structure involving changes in materials used, partitioning, location/size of openings, etc., but does not increase the overall area?
a. repair
b. alteration
c. renovation
d. conversion
b. alteration
In the architect’s range of services, under which services do promotional services fall?
a. Specialised Services
b. Design
c. Construction
d. Pre-design
d. Pre-design
Under the Civil Code, how long is the Architect liable for damages after the construction of a building/structure?
a. 10 years
b. 15 years
c. 30 years
d. 20 years
b. 15 years
Under PD223, which agency has the general supervision of foreign nationals who are granted a special permit to practise architecture in the Philippines?
a. United Architects of the Philippines
b. Department of Education
c. Professional Regulation Commission
d. Department of Foreign Affairs
c. Professional Regulation Commission
In the Architect’s Specialised Allied Services, under which category does the architect prepare plans of contiguous sites for industrial estates, tourist centres, housing subdivisions and the like?
a. Landscape Design
b. Interior Design
c. Industrial Planning
d. Physical Planning
d. Physical Planning