explain the basic purpose of the airspeed program
accomplish the nae mission at reduced source cost
what are the 3 primary airspeed cpi methods
- lean
- six sigma
- theory of constraint
describe the lean methodology
war on waste
describe six sigma methodology
eliminates variation
describe the theory of constraints methodology
finding the bottle neck
define 5s and list the steps
- sort
- straighten
- shine
- standardize
- sustain
who is responsible for the utilization of the 5s checklist
work center supervisor
describe nat and state the purpose of nat reports
niin analysis tool provides maintenance managers with a view of all niins processed at ima’s
demonstrate use of the nat to look for improvement opportunities
compares refi repair capability rates, bcm transactions, ical capability codes with other ima’s
describe bmt and state the purpose of bmt reports
workload tracking and analysis tool that provides information needed to assist in decision making process regarding workload
demonstrate use of the maintenance bmt at the department, division, and work center level
pc tracks trr of different mafs and gauge maintenance efficiency in different divisions and work centers; same with division work centers; keeps track of order in which assets should be worked on
demonstrate printing the bsr report and knowledge of use
division reports - buffer reconciliation - bsr
shows you outstanding parts on order and what percentage
describe cpims and state its purpose
continuous process improvement management system
identifying and implementing the best practices
who is responsible to ensure all airspeed/spi projects and supporting documentation is recorded in cpims? within how many days of tollgate review or event completion does it have?
project lead is responsible and all documents should be leaded within 10 days of completion
describe vsa and state its purpose
value stream analysis
describe roe and state its purpose
rapid movement event - things that can be done without needing a project
describe jdi and state why they are performed
just do it - used for quick improvements
describe domain and state its purpose
define measure analysis improve control
what is the purpose of pc
central point of the entire maintenance effort plans and schedules the ima’s workload
exrep
immediate removal and return to rfi status
ow
owed asset
so
supply officer
use of a Jan in I-level
subassembly repair action completed separately from major component to repair action
what is a cog code
symbol used to provide supply management information, identify types of funds used to purchase item activity
what is the importance of a wuc
code that identifies the system, subsystem, set, component, or part of item being worked on
what is an sm&r code
source, maintenance, and recoverability code
converts specific information to maintenance and supply personnel
sm&r first position
source code
sm&r second position
means of acquiring support
sm&r third position
maintenance use code
sm&r fourth position
repair, lowest level with capability and resource to perform repair
sm&r fifth position
disposition
sm&r sixth position
service option code
purpose of icrl
capability of maintenance
ICRL a1
test and check
ICRL c1
full capability
ICRL c3
limited capability
ICRL d1
full depot capability
ICRL d3
partial to d level capability
ICRL m1
assemble / manufacture