p3b2 Flashcards
explain the basic purpose of the airspeed program
accomplish the nae mission at reduced source cost
what are the 3 primary airspeed cpi methods
- lean
- six sigma
- theory of constraint
describe the lean methodology
war on waste
describe six sigma methodology
eliminates variation
describe the theory of constraints methodology
finding the bottle neck
define 5s and list the steps
- sort
- straighten
- shine
- standardize
- sustain
who is responsible for the utilization of the 5s checklist
work center supervisor
describe nat and state the purpose of nat reports
niin analysis tool provides maintenance managers with a view of all niins processed at ima’s
demonstrate use of the nat to look for improvement opportunities
compares refi repair capability rates, bcm transactions, ical capability codes with other ima’s
describe bmt and state the purpose of bmt reports
workload tracking and analysis tool that provides information needed to assist in decision making process regarding workload
demonstrate use of the maintenance bmt at the department, division, and work center level
pc tracks trr of different mafs and gauge maintenance efficiency in different divisions and work centers; same with division work centers; keeps track of order in which assets should be worked on
demonstrate printing the bsr report and knowledge of use
division reports - buffer reconciliation - bsr
shows you outstanding parts on order and what percentage
describe cpims and state its purpose
continuous process improvement management system
identifying and implementing the best practices
who is responsible to ensure all airspeed/spi projects and supporting documentation is recorded in cpims? within how many days of tollgate review or event completion does it have?
project lead is responsible and all documents should be leaded within 10 days of completion
describe vsa and state its purpose
value stream analysis
describe roe and state its purpose
rapid movement event - things that can be done without needing a project
describe jdi and state why they are performed
just do it - used for quick improvements
describe domain and state its purpose
define measure analysis improve control
what is the purpose of pc
central point of the entire maintenance effort plans and schedules the ima’s workload
exrep
immediate removal and return to rfi status
ow
owed asset
so
supply officer
use of a Jan in I-level
subassembly repair action completed separately from major component to repair action
what is a cog code
symbol used to provide supply management information, identify types of funds used to purchase item activity
what is the importance of a wuc
code that identifies the system, subsystem, set, component, or part of item being worked on
what is an sm&r code
source, maintenance, and recoverability code
converts specific information to maintenance and supply personnel
sm&r first position
source code
sm&r second position
means of acquiring support
sm&r third position
maintenance use code
sm&r fourth position
repair, lowest level with capability and resource to perform repair
sm&r fifth position
disposition
sm&r sixth position
service option code
purpose of icrl
capability of maintenance
ICRL a1
test and check
ICRL c1
full capability
ICRL c3
limited capability
ICRL d1
full depot capability
ICRL d3
partial to d level capability
ICRL m1
assemble / manufacture
ICRL r1
repair and return to originating activity
ICRL x1
repair not authorized
ICRL x2
lack of authorized tools
ICRL x3
lack of required skills
ICRL x6
lack of data
BCM 1
repair not authorized
BCM 2
lack of tools
BCM 3
lack of skill
BCM 4
lack of parts
BCM 5
fails test and check
BCM 6
lack of data
BCM 7
beyond authorized repair
BCM 8
administrative
BCM 9
condemned
AWM m1
awaiting depot repair
AWM m2
SE, hangar, hangar deck spaces, or facilities
AWM m3
backlog
AWM m4
off shift hours
AWM m5
awaiting other
AWM m6
awaiting aimd maintenance
AWM m7
flight ops
AWM m8
awaiting other shops
AWM m9
awaiting maintenance funding
AWM iw
in work
AWM ct
cure time
AWM wp
awaiting parts
AWM jc
job complete
discuss 3 components of milstrip data
- military standard requisitioning and issue procedures
- Julian date of status and current material status
- routing identifier
ba
in process
bf
no record of requisition
bm
document forward to activity
bb
back ordered
bd
delayed
h
material in route via truck
j
material in route via small air parcel
eriou
exrep iou
cancl
requisition cancel
bk1
work stoppage
zc8
down engine
bk0
bench down
zf7
completely down
efficient cannibalization
can switch from one gear to another
inefficient cannibalization
both gear needs the same part
summary reports
division trr summary
daily production reports
detailed active trr
detailed trr research reports
lists may based on user selection data
awp reconciliation reports
non awp with documents detailed awp with no documents
physical buffer reports
buffer status red detailed retrograde trr
cost analysis reports
Dailed report of mafs which have been exceeded the 50% of the repair/bcm factor
what is trr in reference to bmt
time to reliability replenish
what is faq in reference to bmt
pulls data from nalcomis to generate reports to provide focus on priorities for repair and replenishment of buffers in a time domain
what is BSR and what conditions must exist for a component to populate on a BSR report
lists all BSR inventory report will be displayed descending physical buffer status order
what is the purpose of a broad arrow
ba exists when an item is SE in down with the activity losing capability
What is the purpose of a BA addendum
submitted when additional problems related to original failure are detected
What is the purpose of a BA SEIS
submitted when SE is operational and no further assistance is required
BA impact rating c1
no impact on repair capability
BA impact rating c2
impact on repair capability. Turn around time able to meet customer
BA impact rating c3
significant impact on capability - cannot meet demand
BA impact rating c4
no capability to provide repair calibration / service