(OLD) Ch 9 - Bonding And Grounding Flashcards
9–2 safety
Results of disturbances =
Death or injury
9–2 safety
Primary responsibility =
Safeguarding personnel, property
9–2 safety
Best time to design =
Initial planning and construction phases
9–4 background
Bonding =
Between two metallic items
9–6 ITS consideration
New construction =
Electrical contractor must provide means of access
9–6 ITS consideration
Disconnect =
Qualified electrical maintenance person
9–9 measuring the equipment grounding conductor impedance
Equipment grounding conductor can only be accurately measured =
Ground impedance tester
9–10 isolated ground (IG)
IG type receptacle =
Orange triangle
9–10 IG
IG systems =
Not recommended
9–10 signal reference grid (SRG)
SRG =
Grounding and bonding for raised floors
9–12 telecom bonding infrastructure
Bonding overall purpose =
Equalize potentials
9–12 telecom bonding infrastructure
ANSI J-STD-607A =
Commercial building GROUNDING AND BONDING requirements for telecom
9–16 entrance facility (EF)
EF =
TMGB
9–16 EF
TMGB =
3
- Telecommunications main grounding
- 0.25in x 4in
- located as near as possible to cable EF
9–16 EF
BCT =
4
- Bonding conductor
- 6 AWG
- 30ft
- AC panel
9–17 EF
BCT two alternatives =
- Structural steel
* conductor between it TMGB and AC branch circuit panel board
9–18 equipment room (ER)
TGB =
- Telecommunications grounding bar
* 0.25in x 2in
9–19 TR
TBB =
3
- Telecommunications bonding backbone
- costly to achieve
- Long length
9–20 sizing bonding conductor
6AWG =
Does not exceed 100 feet
9–23 bonding connections
Bonding typical connections =
2
- Compression
* exothermic welding
9–24 bonding connection inspection
Visual inspection =
Except impedance (does not belong)
9–26 lightning exposure
Lightning exposure =
3
- Circuits in large metropolitan
- 140ft
- 5 or fewer thunderstorm days per year
9–28 lightning exposure
Direct buried cable collects =
- Ground strikes
* 6.5ft to 20ft
9–31 standards
ANSI J/STD-{670-A}
Bonding and grounding (earthing) commercial bldgs
9–31 standards
ANSI/TIA/EIA-{568-B.1-2}
Grounding and bonding for horizontal cabling
9–31 standards
IEEE 1100 =
Powering and grounding electronic equipment
covers sensitive systems
9–32 standards
LPI =
NFPA 780
9–32 standards
NFPA 70 =
Publishes and NFPA 70 ~ NEC
9–32 standards
NFPA 780 =
Standard lightning protection