(OLD) Ch 9 - Bonding And Grounding Flashcards

0
Q

9–2 safety

Results of disturbances =

A

Death or injury

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

9–2 safety

Primary responsibility =

A

Safeguarding personnel, property

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

9–2 safety

Best time to design =

A

Initial planning and construction phases

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

9–4 background

Bonding =

A

Between two metallic items

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

9–6 ITS consideration

New construction =

A

Electrical contractor must provide means of access

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

9–6 ITS consideration

Disconnect =

A

Qualified electrical maintenance person

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

9–9 measuring the equipment grounding conductor impedance

Equipment grounding conductor can only be accurately measured =

A

Ground impedance tester

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

9–10 isolated ground (IG)

IG type receptacle =

A

Orange triangle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

9–10 IG

IG systems =

A

Not recommended

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

9–10 signal reference grid (SRG)

SRG =

A

Grounding and bonding for raised floors

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

9–12 telecom bonding infrastructure

Bonding overall purpose =

A

Equalize potentials

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

9–12 telecom bonding infrastructure

ANSI J-STD-607A =

A

Commercial building GROUNDING AND BONDING requirements for telecom

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

9–16 entrance facility (EF)

EF =

A

TMGB

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

9–16 EF

TMGB =
3

A
  • Telecommunications main grounding
  • 0.25in x 4in
  • located as near as possible to cable EF
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

9–16 EF

BCT =
4

A
  • Bonding conductor
  • 6 AWG
  • 30ft
  • AC panel
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

9–17 EF

BCT two alternatives =

A
  • Structural steel

* conductor between it TMGB and AC branch circuit panel board

16
Q

9–18 equipment room (ER)

TGB =

A
  • Telecommunications grounding bar

* 0.25in x 2in

17
Q

9–19 TR

TBB =
3

A
  • Telecommunications bonding backbone
  • costly to achieve
  • Long length
18
Q

9–20 sizing bonding conductor

6AWG =

A

Does not exceed 100 feet

19
Q

9–23 bonding connections

Bonding typical connections =
2

A
  • Compression

* exothermic welding

20
Q

9–24 bonding connection inspection

Visual inspection =

A

Except impedance (does not belong)

21
Q

9–26 lightning exposure

Lightning exposure =
3

A
  • Circuits in large metropolitan
  • 140ft
  • 5 or fewer thunderstorm days per year
22
Q

9–28 lightning exposure

Direct buried cable collects =

A
  • Ground strikes

* 6.5ft to 20ft

23
Q

9–31 standards

ANSI J/STD-{670-A}

A

Bonding and grounding (earthing) commercial bldgs

24
Q

9–31 standards

ANSI/TIA/EIA-{568-B.1-2}

A

Grounding and bonding for horizontal cabling

25
Q

9–31 standards

IEEE 1100 =

A

Powering and grounding electronic equipment

covers sensitive systems

26
Q

9–32 standards

LPI =

A

NFPA 780

27
Q

9–32 standards

NFPA 70 =

A

Publishes and NFPA 70 ~ NEC

28
Q

9–32 standards

NFPA 780 =

A

Standard lightning protection