(OLD) Ch 16 - Building Automation Sys Flashcards

0
Q

16–3 foundation for BAS integration

BAS cabling =

A

Not always addressed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

16-1 building automation system

BAS =

A

Except electrical contractor facilities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

16–3 foundation of BAS integration

Traditional BAS =
2

A

The budget

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

16–4 foundation of BAS integration

Costs 25 to 40% =

A

Using a total systems integration approach

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

16–5 planning BAS distribution cabling

Facilities manager =
Telecom manager =

A

BAS

Voice and data

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

16–5 cable pathways

Combining pathway =

A

Reduce 50%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

16–7 BAS controllers

Analog inputs (AI) =

A

Humidity temperature sensors

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

16–7 BAS controllers

digital inputs (DI) =

A

Static pressure sensors

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

16–10 fire alarm system

FA system =
3

A
  • Detection
  • suppression
  • Notification
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

16–13 lighting control

Daylight harvesting =
Daylight to reduce =

A

4%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

16–13 lighting control

demand limiting =

A

Time-delayed dimming

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

16–24 lighting control

Lumen depreciation =
2

A

Fluorescent

13%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

16–31 building automation and control network (BACnet)

BACnet =

A

ANSI standard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

16–34 BACnet

EIB supports =

A

868 MHz band

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

16–46 coverage area

Calculate =
2

A

Work area 100 ft.²

BAS device 250 ft.²

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

16–47 recommended work and coverage area sizes

Mechanical room BAS=

A

5/50

16
Q

16.48 horizontal connection point (HCP)

HCP =

A

49ft

17
Q

16–49 horizontal cabling

BAS copper =

A

16 AWG to 22 AWG

18
Q

16–50 for reducing costs with open house horizontal cabling

Open office =

A

25 to 40%

MAC’s

19
Q

16–56 backbone cabling

BAS backbone=
2

A

Can share backbone

Should not share binder group

20
Q

16–66 references

862 standard

A

Building automation cabling standard for commercial