NAVSEAINST 4790.8C, SHIPS MAINTENANCE AND MATERIAL MANAGEMENT (3-M) MANUAL Flashcards
Who has overall responsibility for ensuring maintenance is accomplished following 3-M System and quality maintenance procedures and that the 3-M System functions effectively within the command?
Commanding Officer
Who is the command’s 3-M System Manager?
Executive Officer
Who is the functional manager of the 3-M System?
3M System Coordinator
The 3M System Coordinator supervision of all administrative facets of the 3-M System program. This position will be assessed in writing as the PRIMARY DUTY of an Officer, Chief Petty Officer or Petty Officer First Class (who has been assigned what secondary Navy Enlisted Classification (NEC))?
9517
The 3M System Coordinator Ensure all routing review signatures have been applied prior to forwarding 3-M documents to the designated data processing activity within how many working days of document origination or as operationally feasible?
7
Who is responsible for the final approval of the 3-M Quarterly Schedule?
Department Head
What shall be submitted requesting a LOEP change for new adds and for equipment removals?
PMS FBR
Department LCPO shall be 3-M PQS qualified up to what level?
Department 3-M System Assistant
Who will review, approve, and close out weekly schedules?
Division Officer
The Division Officer shall ensure all Work Center weekly schedules are updated how often?
Daily
The Division LCPO/LPO shall be qualified 3-M PQS up to what level?
Division Officer
Who is responsible to the Division Officer via the LCPO/LPO for the effective operation of the 3-M System within their respective Work Center?
Work Center Supervisor
What will the Work Center Supervisor use as a daily working document for the scheduling of any maintenance actions not included on the PMS schedules?
Current Ship’s Maintenance Project (CSMP)
What has been developed to provide the Command’s Maintenance Team with the tools to plan, schedule, and control planned maintenance effectively?
PMS
The maintenance procedures developed in accordance with what principles for planned maintenance are the minimum required to maintain equipment within specifications?
Reliability-Centered Maintenance (RCM)
What contains information relative to PMS requirements for specific equipment for which the command is responsible?
PMS Mater File
Who maintains the PMS Master File?
3M System coordinator
What reflects that portion of the PMS Master File that contains only the planned maintenance requirements applicable to a particular Work Center?
Work Center PMS Manual
What provides a listing of the MIPs for systems and equipment assigned to each Work Center, and systems and equipment not requiring PMS or currently being evaluated for PMS?
LOEP
What are basic PMS reference documents?
MIPs
How many SYSCOM MIP control numbering systems have been developed based on changing PMS philosophy and are currently in use?
Three
The SYSCOM MRC Control Number is how many character alphanumeric code which is assigned to each MRC?
7
What delineates how frequently the maintenance requirement must be performed?
Periodicity Code
What following the periodicity code indicates a Safety of Ship item?
Asterisk (*)
What following the periodicity code indicates that this procedure is intended to be scheduled and performed by Off-Ship Maintenance Personnel?
Single plus (+)
What following the periodicity code indicates that this procedure is intended to be scheduled and performed by either Ship’s Force or Off-Ship Maintenance Personnel?
Double plus (++)
What are maintenance requirements that must be accomplished concurrently with another maintenance requirement?
Mandatory related
What are maintenance requirements that can be accomplished concurrently with another maintenance requirement for saving of time or manpower considerations?
Convenience related
All or part of the related MRC is performed when specific conditions are present or not met on the referencing MRC is known as what type of maintenance?
Conditional related
What type of maintenance is corrective in nature used to return system or equipment to operational condition within predetermined tolerances or limitations?
Unscheduled Maintenance (U)
ICMP tasks are not applicable to submarines and what else?
Carriers
What provide detailed procedures for performing maintenance requirements and describes who, what, how, and with what resources a specific maintenance requirement will be accomplished?
MRCs
What defines an event that must occur for an MRC to be scheduled?
Situational requirement
What type of event is a persistent event that can be tracked over duration of time (in days)?
State
What type of event is a single occurrence or action that may have a maintenance action tied to it?
Trigger
What type of event is an event that is based on the current value of a measurement in relation to the value at the time of the last accomplishment?
Metered
What is an aid that is used to determine when the MRC is scheduled based on the occurrence of the event?
Offset Information
What specifies the situation that must exist in order for the maintenance to be accomplished, and has no effect on scheduling?
Prerequisite
What maintenance requirements are those documented actions required to restore a system/equipment to an operational condition within the predetermined tolerances or limitations?
Unscheduled
What is used only for General Purpose Portable Electrical and Electronic Test Equipment (GPETE) listed in the Test, Measurement, and Diagnostic Equipment Index (TMDE-I)?
Category I
What establishes allowances for GPETE for ships and shore activities under NAVSEA cognizance?
SPETERL
What are defined as any items, which are an integral part of the equipment?
Parts
What block details the sequence of steps to be followed in performing the maintenance action?
Procedure
What are associated with equipment safety, e.g., failure to accomplish the step could result in damage to equipment?
Cautions
The three segment code used in cataloging MRCs is located as a footer on what side of each page of each MRC card?
Right
What documents provide new or changed procedures that have not been given a final engineering validation?
Preliminary
What are authorizations for and a record of changes to an existing MIP or MRC, or the addition of a new MRC?
Advance Change Notices (ACNs)
What represents a new MIP and at least one new MRC?
Special Issue
What changes are authorized revisions to any aspect of existing PMS documentation and are authorized in TFBR responses?
Pen & Ink
Individual ships sometimes consider it desirable or necessary to shift maintenance responsibility from one Work Center to another, to combine two or more existing Work Centers, or to split an existing Work Center. These requests for changes of PMS maintenance responsibility require concurrence from whom and may require final approval by the applicable TYCOM?
Executive Officer
Who is the only person that can authorize the splitting of a MIP if an MRC requires another Work Center to completely perform the MRC?
Executive Officer
Who will develop a split MIP log to manage all split MIPs for the command?
3-M Coordinator