NAVAIR 13-1-6.1-1 Life Rafts Flashcards
What is covered in the NAVAIR 13-1-6.1-1 chapter 4?
The LR-1, a one man life raft assembly
What is covered in the NAVAIR 13-1-6.1-1 chapter 6?
The LRU-18/U, a one man life raft assembly
What is covered in the NAVAIR 13-1-6.1-1 chapter 9?
The LRU-13/A, seven man life raft assembly
What is the LR-1 life raft constructed of?
Polychloroprene coated cloth
What are the colors inside and outside of the weathershield in the LR-1?
The weathershield is nonspecular sea blue outside and bright red on the inside
What size and type of thread is used to safety tie the LR-1 ripcord pins?
E thread single
LR-1 measure time of inflation; liferaft shall inflate to designed shape without evidence of restriction in less than______?
One minute
How many pounds you use for the cable proof load test?
50 pounds
What PSIG do you inflate the LR-1 for visual test?
1.0 PSIG
The LR-1 weight of CO2 is 0.50 lbs plus or minus what?
Plus or minus 0.01 pounds
LR-1 leak test fill to 2.0 psig, wait 15 minutes record temp, barometric pressure, and allow to remain undisturbed for how long?
4 hours
After an minimum of four hours test pressure shall not decrease to let than?
1.6 psig from a maximum test pressure of 2.0 psig
LR-1. Tighten coupling nut to life raft inlet valve to a torque value of?
85 plus or minus 5 lbs
LR-1 prepare solution of detergent (MIL-D-16791) consisting of 1/4 to 1/2 once of detergent per _____?
Gallon of water
LR-1. Toluene shall be the primary solvent used in the fabrication or repaired of this assembly. ______ may be used if toluene is not available.
MEK