4790. Chapter 5 Flashcards

1
Q

What is an on-condition inspection developed to address special requirements of F/A 18 series aircraft, of course at the end of a set operational service period, within nine months window? (Pg. A-58)

A

PACE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the automated system used for tracking the composition, location, and operating time/cycle counts or life usage indexes of aircraft engines, propulsion systems, modules, and life limited components? (Pg. A-60)

A

PLTS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the act of effecting transfer in control, use or location of material between units or activities within or among the military services or between the major services and other federal agencies? (Pg. A-65)

A

Redistribution

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is it planned and systematic pattern of all the actions necessary to provide adequate confidence that the item or product conforms to established technical requirements and will perform satisfactorily in service? (Pg. A-63)

A

Quality Assurance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the code assigned to support items to indicate to maintenance and supply personnel that reclamation or disposition action required for items removed and replaced during maintenance? (Pg. A-65)

A

Recoverability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the plan or system under which action may be taking toward a stated goal or objective? (Pg. A-62)

A

Program

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the six-character number permanently assigned to each reporting custodian of aircraft? (Pg. A-63)

A

Permanent Unit Code (PUC)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the functional organization within the IMA responsible for workload control? (Pg. A–62)

A

Production Control

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the systematic, decision-making process used to identify and manage hazards that endanger naval resources? (Page A-58)

A

Operational Risk Management (ORM)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is a grouping of repairable assemblies provided to a rework activity as replacement for similar defective repairable assemblies removed from an aircraft or engine undergoing some phase of rework that are not to be reworked concurrently with the aircraft or engine from which was removed?

A

Pool

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

In logistics, what is the channel of support or a specific portion thereof, by means of which material or personnel flow from s services of procurement to the point of use?

A

Pipeline

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are the obligations issued by TYCOMs to units of the operating forces under their command from one of their budgets? (Pg. A-57)

A

OPTAR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What maintenance is performed by an operating unit on a day-to-day basis in support of its own operations?

A

O-level

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the official statement of billets, personnel, and training input and resource requirements to support introduction and operational use of aircraft, systems, subsystems, equipments, and other developments?

A

NTSP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the process of doing the technical planning necessary to establish the item support plan, piece by piece and assembly by assembly; establishing the minimum levels of
echelons responsible for repair?

A

Provisioning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the method that uses x-rays or similar radiation for the purpose of penetrating or being scattered by substances to reveal flaws or defects in the part or structure being examined?

A

Radiographic

17
Q

The policy and procedures for PQS are outlined in the what instruction?

A

OPNAVINST 3500-34

18
Q

What is the process of disassembly sufficient to inspect all the operating components and the basic end article?

A

Overhaul

19
Q

What is the process of obtaining personnel, services, supplies, and equipment?

A

Procurement

20
Q

What are documents that describe the knowledge and skills trainees must have to correctly perform their duties?

A

PQS

21
Q

The purpose of ____ is to provide scheduled control of the predictable maintenance workload, for example, inspections, transfer or receipt of aircraft, and compliance with TDs?

A

Monthly Maintenance Plan (MMP)

22
Q

Instructions for using the material priority system and for assigning FADs are in what series?

A

OPNAVINST 4614.1