NAVAIR 06-20-20-2 Gas Cylinders (Chapter 6) Flashcards

1
Q

What is covered by chapter 6 of the NAVAIR 06-20-2?

A

Hydrostatic test requirements for compressed gas cylinders at the organizational and intermediate level

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What facilities can perform hydrostatic tests on gas cylinders?

A

Contractor facilities that have been approved and registered with the DOT. Military facilities that perform hydro testing must also be approved by the DOT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

If shipping EMPTY cylinders for refill, what must be ensure?

A

Ensure that EMPTY cylinders are not due for hydrostatic test. If hydrostatic test is within 45 days of being due, request contractor to perform one before filling

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Cylinders shall not be shipped overseas when hydrostatic test will come due within _____ months.

A

6 months. These cylinders are limited to shipment within the continental US

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Hydrostatic rest dates. Where shall the test date be stamped on the cylinder?

A

Each time a cylinder is retested, the date is stamped on the shoulder of the cylinder with a steel stamp to indicate the month and year of he test

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What cylinders are exempted from hydrostatic tests?

A

All cylinders not exceeding 2 inches outside diameter and a length of less than 2 feet are exempted from hydrostatic retest.
Cylinders designated3E, 4C, 8 or 8AL are exempted from hydrostatic retest

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How to requalify DOT-8 cylinders

A

Owners of DOT-8 series cylinders used to transport acetylene must have the cylinder shell and porous filler requalified IAW CGA Pamphlet C-13

How well did you know this?
1
Not at all
2
3
4
5
Perfectly