MT Ctrls Flashcards

1
Q

What is IOPS powered by?

A

CRIDS I, II, III

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does IOPS do?

A
  • Backup Overspeed protection at 110% (Hardwire trip)
  • Its energize to trip (2/3) passive probes
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the DCS power supply?

A

BOP Battery System (250 VDC) thru inverter

- BLC/CLC backup to inverters **

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the DCS purpose?

A

Supply hydraulic fluid (motive force) for stop/control valve operation during normal and emergency conditions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What does hood spray protect against?

A

Prevents LPT blade overheating

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How fast do 10% and 20% manual runbacks go?

A

100 MW/min

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When is a loss of a MFP runback enabled?

A

Unit 1 = 54.5%
Unit 2 = 60%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When a MFP is lost, how far do the main turbines runback?

A

Unit 1= 625 MW
Unit 2 = 752 MW

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What will the Load Target be for an Over Power Delta Temperature and Over Temperature Delta Temperature Runback be?

A
  • Target Load to 30 MW
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When is power load unbalance armed?

A

Armed when 1st Stage Press > 40% (from DCS)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the Main Turbine Load Reference for a power load unbalance?

A

Load Ref to 30 MW

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What does the Droop Speed override signal do?

A
  • Biases Load Ref signal which closes down on control valves and Intermediate Valves
  • Protects from overspeed condition with output breaker closed
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When is the Droop Speed override signal active?

A

> 1805 rpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the primary tripping device of the Main Turbine?

A
  • Trip Block Assembly
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the one turbine trip input from TSI?

A

Thrust Bearing position

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Will a failure of all 3 PLC speed sensors on the Turbine give you a turbine trip while on the grid?

A

NO!! Only if you’re NOT paralleled.

17
Q

What is the load target for an ATWS runback?

18
Q

What is the purpose of Power Load Unbalance?

A
  • Provides overspeed protection in the event of a large load rejection
  • Used only on ATWS when the MT also fails to trip with manual AMSAC or Solenoid Trip
19
Q

Which valves will reposition when resetting the Main Turbine?

A

The Reheat Valves open

20
Q

What do the combined stop and intercept valves do for the turbine?

A

protect against overspeed of the turbine from residual steam from the MSRs on a turbine trip

21
Q

If moving the turbine in MW Control IN, what happens?

A

Load reference will ramp toward the Load Target and the PLC sends a signal to the control valves to match Load Reference.

22
Q

When in MW control IN, what happens when lake temperature moves around?

A

Valves will move around to maintain a constant MW value

23
Q

When in MW control OUT, what happens when lake temperature moves around?

A

Valve position stays constant, but MWs will move around

24
Q

What is unique to the Power Load Unbalance Runback?

A

Forced to MW OUT. All other Runbacks are forced to MW IN

25
What kind of probes does IOPS use?
passive probes
26
With regards to the solenoids for the Trip Block assembly, the MT will trip when how many solenoids do what?
2/3 de-energize
27
When an operator places MT DCS to MW IN, the values for the Load Target, Actual Load and Load Reference will go to what value?
the MW value of the Actual Load
28
The power load unbalance system is armbed above ____% and looks for a large rate of change in generator ____ per second
40% and amps
29
When is turbine warming required for Unit 1? And what is used?
Chest warming required < 460ºF Shell warming required < 250ºF Utilize SV2