Maintenance and Commissioning Flashcards

1
Q

Repair equipment on failure is what kind of maintenance strategy?

A

Reactive or unscheduled

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Routine maintenance is what kind of maintenance?

A

Routine maintenance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Using technology to predict failures before that happen

A

Predictive maintenance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What kind of maintenance can detect bad connections in electrical infrastructure, signs of impending malfunctions, malfunctioning steam traps, damaged insulation in building envelope

A

Infrared analysis (thermography)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Anomalies from bad electrical infrastructure can be from these 5 things. Diagnose with vibration signatures or observations over time

A

loose connections, dirt, damaged parts, phase or other imbalances, overloaded neutrals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

this measures vibration signatures of machinery to find:
bad bearings and/or gears, poor alignment or balance, and loose machine mountings

can you help identify if a motor is securely fastened to the floor

A

vibration analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

This measure can be analyzed for wear and tear on processes, bearings, gears, etc.
Send this sample for testing
receive report
decide on best path forward

A

Lubricant (oil) analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

This analysis can identify problems before they cause downtime

A

Baseline and Trend analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

This process focuses on verifying and documenting that all of the commissioned systems and assemblies are planned, designed, installed, tested, operated, and maintained to to meet the owner’s project requirements

A

commissioning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

repeating commissioning activities when an existing building is modified, or every 3-5 years

A

Re-commissioning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

commissioning an existing building ( that was not previously commissioned)

A

Retro-commissioning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Interval monitoring of building systems and parameters - usually a computer based trending - in order to detect issues in real time

A

Ongoing commissioning (real-time, continuous)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

individual who is in charge of the Cx process and makes final recommendations to the owner regarding functional performance of the commissioned building systems

A

commissioning provider or commissioning authority