LRU-33/A (C-130 Wing Raft) Flashcards
This flashcard deck was created using Flashcardlet's card creator
Volume of raft?
86.3 cubic feet
What is it made out of?
Yellow urethane – coated nylon
Operating pressure?
1.5 to 3.6 PSIG at 70 F
Normal capacity of persons and overload capacity?
20 persons- normal
30 persons- overload
Inflation time?
30 seconds
What are the five major subsystems?
- The inflatable liferaft
- inflation assembly
- a repair kit
- a urethane coated nylon carrying case
- survival items container
What pressure does the relief valve open and then closes back at?
Opens-3.2 psig (2.2N/cm2)
Closes-2.4 psig (1.7N/cm2)
The leak test inspection will be performed at intervals not to exceed how many days?
180 days
The functional test will normally be performed as part of acceptance inspection and at intervals that conside with every ____ leak test inspection or ____ every months.
Every 6th leak check
36 months
Where are the repair procedures for the LRU-33 what process guide?
85-00-310
The inflation assembly is rated for?
3,500 PSIG (+- 100 psig)
What is the bottle made out of?
Aluminum cylinder reinforced with overlapping carbon filaments bonded with epoxy resin
The bottle is mixed with how many pounds of C02 and of N2?
CO2- 3.06 pounds
N2-5.7 pounds
A pull force of ____pounds is required to actuate the inflation valve.
6-15 pounds
The overpressure ruptured disc will burst at?
4,500-4,950 psig