Aerial Delivery System Flashcards
This flashcard deck was created using Flashcardlet's card creator
What are the required dimensions for the parachute packing table?
45ft by 36in by 36in
For drying parachutes hoist lines shall be spaced a minimum of ____ apart and at least ____ from the wall.
24in apart
12in from wall
When storing a parachute on a shelf or open rack it must be at least ____ from the walls and ____ from the floor.
4 in from wall
12 in from floor
Ideal conditions are a temperature of ____ and a relative humidity of ____.
75 F (24 C) temp 60% humidity
How many times a day shall relative humidity and temperature be recorded?
Three times
Parachutes shall not be exposed to fluorescent lights closer ____ for long periods of time?
5 ft
A parachute shall not be exposed to incandescent light or indirect sunlight for more then?
36 hours(never in sunlight)
12 foot chute cargo weight?
40 to 70 pounds
28 foot chute cargo weight?
70 to 250 pounds
How many feet of trail line?(Parachute)
430 ft
400ft polypropylene line
30ft Manila
Static line length?
15ft C-130
10ft HU-25
Delay on cutting device (CAD)
10 sec
Inspections will normally be performed at intervals not to exceed what?
180 days
Does a seven-day inspection of the shoot require a MPC sign off?
No
In ADS component shall be considered beyond repair for what reasons?
- one or more complete gore is torn
- holes larger than 8 inches long on four or more panels
- if more than three panels per canopy require replacement
- severed suspension line
- ruptured or frayed suspension lines
- frayed riser assembly