LRU-16/P Flashcards
How is the canopy on the one man raft closed?
Hook and pile.
How is the oral inflation assembly for the inflation tube identified?
Its either solid red or has red tape around it.
Where is the sea anchor?
At the bow.
What is the purpose of the sea anchor?
Prevent oscillation, stabilize, and slow drift.
What are the five tasks involved when preforming life raft inspections?
Screening inspection, functional test, leak test, inflation assembly inspection, and records updating.
What should you do prior to actually beginning any inspection of a life raft?
Check TO and forms to know what inspection is needed.
Which cleaning material is preferred for the LRU-16/P?
Knight spray nine.
When may an overcharged cylinder be used for a functional test?
Never.
How often is the functional test performed?
Every 4th inspection cycle.
How often should a leakage test and all other inspection tasks be performed?
On issue and every inspection cycle there after.
What is the ideal climate for storage of the LRU-16/P?
75 degrees, 60%.
To what pressure is the LRU-16/P inflated to for a leak test?
2.5 PSI
What is the max time allowed to inflate the LRU-16/P using an OSHA approved air nozzle with 40 PSI?
2min30sec
Describe how to inflate the floor ans spray shield.
Compressed air not the exceed 5 PSI. Inflate the floor to .5 PSI and the shield until it dimples.
What is the min and max time the LRU-16/P can sit during a leak test?
Min:6 Max:8 hours