Lesson 2 Starting the Project Flashcards
focus groups
a group providing expectations and attitudes about a product, service or result
SMART objectives
Objective adhering to the SMART criteria: Specific, Measurable, Achievable, Relevant and Time-bound
predictive life cycles
form of project life cycle where scope, time and cost are determined in the early phases of the life cycle
agile life cycles
also called adaptive life cycle; form of project life cycle that uses an iterative and incremental approach to define and deliver the results of the project
iterative life cycles
form of project life cycle where the result or product is developed through a series of repeated cycles with each cycle providing more functionality
incremental life cycles
form of life cycle that delivers the product in functional increments through a series of cycles
hybrid methodologies
methodologies that combine both predictive and agile approaches
requirements traceability matrix
a grid that links requirements from their origin to the deliverables that satisfy them
agile estimating
estimating techniques that use relative estimates as opposed to definitive
product backlog
a prioritized list of customer requirements or user stories
scope management plan
a component of the project management plan that describes how the scope will be defined, developed, monitored, controlled and validated
affinity diagramming
a technique that allows for large number of ideas to be classified into groups for analysis and review
context diagram
a visual representation of a product, service or process
requirements management plan
a component of the project management plan that describes how requirements will be collected, analyzed, documented and managed
project scope statement
a document that describes the project scope, the deliverables, exclusions, constraints and assumptions
WBS
(work breakdown structure) - a hierarchical decomposition of the total scope of work
WBS dictionary
a document that provides the detail description of each component in the WBS
control accounts
management control points where scope, schedule and costs are integrated
planning package
a WBS component below the control account with known work content but without detailed scheduled activities
code of accounts
a numbering system used to uniquely identify each component of the WBS
work package
the work defined at the lowest level of the WBS
user story
a brief description of the definable value for a specific user
sprint backlog
a list of work items to be completed in a scrum sprint
definition of done (DoD)
a list of the criteria required to be met for the deliverable to be considered complete or ready to use
acceptance criteria
a set of conditions required to be met before a deliverable can be accepted