IMO Resolution A.817(19) - ECDIS Flashcards

1
Q

The primary function of the ECDIS is to contribute to _________________________-.

A

safe navigation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

ECDIS should be capable of displaying all chart information necessary for safe and efficient navigation originated by, and distributed on the authority of _________________________________________.

A

government-authorized hydrographic offices

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Electronic chart display and information system (ECDIS) means a navigation information system which, with adequate back-up arrangements, can be accepted as complying with the up-to-date chart required by regulation V/20 of the 1974 SOLAS Convention, by displaying selected information from a _______________________________ with positional information from navigation sensors to assist the mariner in route planning and route monitoring, and by displaying additional navigation-related information if required.

A

system electronic navigational chart (SENC)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

System electronic navigational chart (SENC) means a __________________ resulting from the transformation of the ENC by ECDIS for appropriate use, updates to the ENC by appropriate means, and other data added by the mariner. It is this________________ that is actually accessed by ECDIS for the display generation and other navigational functions, and is the equivalent to an up-to-date paper chart. The SENC may also contain information from other sources.

A

database / database

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

________________________ means the SENC information that should be shown when a chart is first displayed on ECDIS.

A

Standard display

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

_____________________ means the level of SENC information which cannot be removed from the display, consisting of information which is required at all times in all geographical areas and all circumstances. It is not intended to be sufficient for ________________________.

A

Display base / safe navigation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

SENC information available for display during route planning and route monitoring should be subdivided into three categories: ______________________, _______________________, and ________________________.

A

display base / standard display /all other information

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

ECDIS should present the standard display at any time by a ______________________.

A

single operator action

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When a chart is first displayed on ECDIS, it should provide the standard display at the ______________ scale available in the SENC for the displayed area.

A

largest

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

It should be easy to add or remove information from the ECDIS display. It should not be possible to remove information contained in the ____________________.

A

display base

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

It should not be possible to _____________ the contents of the ENC.

A

alter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

_______________ should be stored separately from the ENC.

A

Updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

ECDIS should provide an indication of whether the information is displayed at a ______________ scale than that contained in the ENC or own ship’s position is covered by an ENC at a ______________scale than that provided by the display.

A

larger / larger

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

____________ information or other navigational information may be added to the ECDIS display. However, it should not degrade the SENC information, and should be clearly ___________________ from the SENC information.

A

Radar / distinguishable

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

It should always be possible to display the SENC in a _________________ orientation. Other orientations are _________________.

A

“north-up” / permitted

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

ECDIS should be capable of displaying information for: _____________ ___________ and supplementary navigation tasks and ____________ ______________.

A

route planning / route monitoring

17
Q

The effective size of the chart presentation for route monitoring should be at least _________ mm by ________ mm

18
Q

The____________ _________ data available in the SENC for the area given should always be used by the ECDIS for all alarms or indications of crossing the ship’s safety contour and of entering a prohibited area.

A

largest scale

19
Q

It should be possible to plan an ______________ _____________ in addition to the ________________ ______________.

A

alternative route / selected route

20
Q

An _________________ is required if the mariner plans a route across an own ship’s safety contour and across the boundary of a prohibited area or of a geographical area for which special conditions exist.

A

indication

21
Q

ECDIS should give an _____________ if the ship, within a specified time set by the mariner, is going to cross the safety contour or is going to cross the boundary of a prohibited area or of a geographical area for which special conditions exist.

22
Q

The positioning system and the SENC should be on the same _________________. ECDIS should give an ____________ if this is not the case.

A

geodetic datum / alarm

23
Q

During the voyage, it should be possible for the mariner to _______________ the selected sailing route or change to an _________________ ___________.

A

modify / alternative route

24
Q

ECDIS should store and be able to reproduce certain minimum elements required to reconstruct the navigation and verify the official database used during the previous _______________

25
The following data should be recorded at _______________ intervals: time, position, heading, and speed, to ensure a record of ______________________, and ENC source, edition, date, cell and update history, to ensure a ________________________.
one-minute / own ship's past track / record of official data used
26
In addition, ECDIS should record the complete track for the entire voyage, with time marks at intervals not exceeding ______________.
4 hours
27
ECDIS should be connected to systems providing continuous ____________________, ________________ and ______________ information
position-fixing / heading / speed
28
Changing from one source of power supply to another, or any interruption of the supply for a period of up to __________, should not require the equipment to be re-initialized manually.
45 s
29
An alarm / alarm system announces by _____________ means, or ____________ and _________or__ means, a condition requiring attention
audible / audible / visual
30
An indicator is a ______________ indication giving information about the condition of a system or equipment.
visual