HLC 23 Flashcards
Given the following conditions:
* Unit 1 is at 100% power
Subsequently:
* PZR PORV, V1402 experiences a MECHANICAL failure which results in V1402 failing OPEN
Which ONE of the following describes where PZR PORV 1402 will discharge to and what will provide the INITIAL indication in the Control Room?
PZR PORV 1402 discharges to the ____(1)____ and the INITIAL Control Room indication will be provided by the ____(2)____.
A.
(1) Quench Tank
(2) Acoustic Monitoring System LEDs LIT
B.
(1) Quench Tank
(2) PORV V1402 indicating lamp indicating RED
C.
(1) Reactor Drain Tank
(2) Acoustic Monitoring System LEDs LIT
D.
(1) Reactor Drain Tank
(2) PORV V1402 indicating lamp indicating RED
A.
(1) Quench Tank
(2) Acoustic Monitoring System LEDs LIT
Given the following conditions:
* Unit 2 was manually tripped due to a LOCA
* 2-EOP-01, SPTAs are in progress at Step 6, VERIFY Core Heat Removal
Which ONE of the following completes the statement below?
In accordance with 2-EOP-01, SPTAs, Step 6, RCPs are required to be secured due to inadequate subcooling based on ____(1)____ subcooling less than ____(2)____.
A.
(1) RCS
(2) 10 °F
B.
(1) RCS
(2) 20 °F
C.
(1) REP CET
(2) 10 °F
D.
(1) REP CET
(2) 20 °F
B.
(1) RCS
(2) 20 °F
Which ONE of the following describes the MINIMUM action times to be taken if Component Cooling Water (CCW) to the Reactor Coolant Pumps (RCPs) is lost in accordance with 1-AOP-01.09A1, 1A1 Reactor Coolant Pump?
1-AOP-01.09A1 directs the RCPs to be tripped ____(1)____ if CCW is lost AND ISOLATE Controlled Bleed Off if CCW is lost for greater than _____(2)_____ minutes.
A.
(1) Immediately
(2) 10
B.
(1) Immediately
(2) 30
C.
(1) within 10 minutes
(2) 10
D.
(1) within 10 minutes
(2) 30
D.
(1) within 10 minutes
(2) 30
Given the following conditions:
* Unit 1 is at 50% power and STABLE at time 12:00
* A RCS leak is in progress
* V2504, RWT to Charging pumps, is CLOSED and breaker is OFF
* Pressurizer Level is 43% and STABLE
* Letdown Flow is 29 gpm
* ALL Charging Pumps are running
* VCT Level is 50% and LOWERING
* RCP 1A1 CBO: 1.4 gpm
* RCP 1B1 CBO: 1.4 gpm
* RCP 1A2 CBO: 1.4 gpm
* RCP 1B2 CBO: 1.3 gpm
Which ONE of the following is the expected time that a LOSS of Charging would occur?
A. 12:11 - 12:12
B. 12:13 - 12:14
C. 12:15 - 12:16
D. 12:30 - 12:31
C. 12:15 - 12:16
Given the following conditions:
* Unit 2 is in Mode 5 entering a refueling outage
* RCS is SOLID
* RCS Pressure is 250 psia
* The 2A and 2B Shutdown Cooling Trains are in service
* 2A S/G NR level is 65%
* 2B S/G NR level is 5% draining in progress
Subsequently:
* The 2B LPSI pump trips
Which ONE of the following describes the Tech Spec compliance for shutdown cooling train?
Tech Spec 3.4.1.4.1, RCS Cold Shutdown – Loops Filled is currently ____(1)____ due to ____(2)____.
A.
(1) met
(2) S/G water levels being sufficient
B.
(1) met
(2) ONLY ONE train of SDC is required to be operable and in operation
C.
(1) NOT met
(2) S/G water levels being insufficient
D.
(1) NOT met
(2) BOTH Trains of SDC are required to be operable AND in operation
C.
(1) NOT met
(2) S/G water levels being insufficient
Given the following conditions:
* Unit 2 is at 100% power
Subsequently:
* Annunciator LA-10, CCW Surge Tank Compartment “A” Level Low ALARMS
* LG-14-2A, CCW Surge Tank Level indicates 29 inches and VERY SLOWLY LOWERING
* LG-14-2B, CCW Surge Tank Level indicates 30 inches and STABLE
* LCV-14-1, Demin Water to CCW Surge Tank, is CLOSED
Which ONE of the following completes the statements below?
IF V14103, LCV-14-1 Bypass Valve FAILS to OPEN the crew is required to align the _____(1)_____ Header to restore CCW Surge Tank Level in accordance with 2-AOP-14.01, Component Cooling Water Abnormal Operations.
_____(2)_____ “N” Header Isolation Valves have AUTOMATICALLY CLOSED.
A.
(1) Fire Water
(2) TWO
B.
(1) Fire Water
(2) FOUR
C.
(1) Service Water
(2) TWO
D.
(1) Service Water
(2) FOUR
A.
(1) Fire Water
(2) TWO
Given the following conditions:
* Unit 1 is at 100% power
* PIC-1110X, Pressurizer Pressure Controller is selected
* Pressurizer pressure is being maintained at 2250 psia with Pressurizer Backup Heaters B1, B2 and B5 ON with a 10% output to the Pressurizer Proportional Heaters
Subsequently:
* PIC-1110X, Pressurizer Pressure controller OUTPUT slowly drifts HIGH due to a PT-1110X malfunction
Which ONE of the following describes the response of the OUTPUT on HIC-1100, Main Spray controller AND the effect on ACTUAL Pressurizer pressure?
HIC-1100, Main Spray Controller OUTPUT ____(1)____.
ACTUAL Pressurizer pressure ____(2)____.
A.
(1) RISES
(2) RISES
B.
(1) RISES
(2) LOWERS
C.
(1) LOWERS
(2) LOWERS
D.
(1) LOWERS
(2) RISES
B.
(1) RISES
(2) LOWERS
Given the following conditions:
* Unit 2 is at 100% power
Subsequently:
* The 2A Main Feedwater Pump TRIPS
Which ONE of the following completes the statements below?
In accordance with 2-AOP-09.04, Feedwater, Condensate, and Heater Drain Pump Abnormal Operations, the crew is required to trip the Reactor at a S/G Narrow Range level of ____(1)____.
If the MANUAL trip buttons failed to trip the Reactor and the Reactor did not AUTOMATICALLY trip, the crew is required to ____(2)____ in accordance with 2-EOP-01, SPTAs.
A.
(1) 35%
(2) LOCALLY OPEN TCB-1 through TCB-8
B.
(1) 50%
(2) LOCALLY OPEN TCB-1 through TCB-8
C.
(1) 35%
(2) DEENERGIZE LC 2A2 and LC 2B2 from RTGB-201
D.
(1) 50%
(2) DEENERGIZE LC 2A2 and LC 2B2 from RTGB-201
B.
(1) 50%
(2) LOCALLY OPEN TCB-1 through TCB-8
Given the following conditions:
* Unit 2 Reactor has been tripped
* SGTR has occurred on the 2B Steam Generator
* 2-EOP-04, Steam Generator Tube Rupture is in progress at Step 10, Initiate lowering the RCS temperature to less than 510 °F
* RCS cooldown is in progress using SBCS
The following annunciators are in alarm:
* P-8, MSIS Channel A Actuation Blocked
* P-20, MSIS Channel B Actuation Block Permissive
Which ONE of the following completes the statements below?
MSIS will actuate at ____(1)____.
If NO operator action is taken and the MSIS setpoint is reached, the 2A MSIV ____(2)____ CLOSE.
A.
(1) 600 psia
(2) will
B.
(1) 600 psia
(2) will NOT
C.
(1) 626 psia
(2) will
D.
(1) 626 psia
(2) will NOT
A.
(1) 600 psia
(2) will
Given the following timeline:
00:00:00 Unit 1 tripped from 100% power due to a loss of BOTH MFPs
S/G Narrow Range (NR) Levels are:
TIME:
00:01:00
S/G A: 23%
S/G B: 28%
00:03:00
S/G A:17%
S/G B: 23%
00:06:00
S/G A:15%
S/G B:19%
00:07:00
S/G A:14%
S/G B:18%
Which ONE of the following is the expected status of AFW at time 00:07:00?
The ‘B’ AFW header flow control valve(s) are ____(1)____.
The ‘C’ AFW pump Steam Supply will be from ____(2)____ S/G(s).
A.
(1) OPEN
(2) ONLY the A
B.
(1) OPEN
(2) BOTH the A and B
C.
(1) CLOSED
(2) ONLY the A
D.
(1) CLOSED
(2) BOTH the A and B
D.
(1) CLOSED
(2) BOTH the A and B
Given the following conditions:
* Unit 1 tripped due to a Loss of Off-Site Power
* 1-EOP-09, LOOP/LOFC is in progress at Step 26, Cooldown the RCS
* RCS Pressure is 1825 psia
* Thot is 550 °F
* Tcold is 510 °F
* Rep CET is 560 °F
Which ONE of the following completes the statements below?
Current RCS Subcooling is ____(1)____.
IF RCS Pressure is maintained at 1825 psia, the RCS can be cooled down to anMINIMUM indicated RCS temperature of ____(2)____ in accordance with the provided reference.
(REFERENCE PROVIDED)
A.
(1) 63 °F
(2) ~ 430 °F
B.
(1) 63 °F
(2) ~ 450 °F
C.
(1) 73 °F
(2) ~ 430 °F
D.
(1) 73 °F
(2) ~ 450 °F
A.
(1) 63 °F
(2) ~ 430 °F
Given the following conditions:
* Unit 1 is at 100% power
* 1MC Instrument Bus is being supplied by its associated alternate source
* 1C Instrument Inverter Maintenance is complete and available
Subsequently:
* The 1MA Instrument Bus is lost
* The US has directed placing the 1MA Instrument Bus on its associated alternate source in accordance with 1-AOP-49.02, 120V Instrument AC System (CLASS 1E)
Which ONE of the following describes the sequence required to restore the 1MA Instrument Bus?
The 1MC Instrument Bus must be removed from the ____(1)____ bus prior to restoring power to the 1MA Instrument Bus due to a(n) ____(2)____ interlock.
A.
(1) Isolimiter
(2) Electrical
B.
(1) Isolimiter
(2) Mechanical
C.
(1) Maintenance Bypass
(2) Electrical
D.
(1) Maintenance Bypass
(2) Mechanical
D.
(1) Maintenance Bypass
(2) Mechanical
Given the following conditions:
* Unit 1 is at 100% power
* The 1B and 1BB Battery Chargers are BOTH in service
Subsequently:
* A Loss of Off Site Power occurs
* The 1B EDG output breaker fails to auto CLOSE
Which ONE of the following completes the statements below?
When the 1B EDG output breaker is CLOSED, restoration of the 1B and 1BB Battery Chargers ____(1)____ AUTOMATICALLY return to service on the 1B DC Bus.
IF the 1B EDG output breaker is NOT closed, TS 3.8.2.3, D.C. Distribution – Operating, ____(2)____ require action within 1 hour.
A.
(1) will
(2) does
B.
(1) will
(2) does NOT
C.
(1) will NOT
(2) does
D.
(1) will NOT
(2) does NOT
A.
(1) will
(2) does
Given the following conditions:
* Unit 2 experienced a SGTR
* RCS Pressure is 1650 psia
Which ONE of the following describes the response of MV-21-2 and MV-21-3, (Intake Cooling Water Header to Turbine Cooling Water Heat Exchangers (HXs) AND the reason for the response?
MV-21-2 and MV-21-3 will ____________.
A. CLOSE; to ensure sufficient cooling flow to the CCW HXs
B. CLOSE; to ensure the Intake Cooling Water Pumps will NOT be at runout flow
C. remain OPEN; to ensure cooling flow to the Open Blowdown Cooling System HXs to support S/G sampling
D. remain OPEN; to ensure cooling flow to the Open Blowdown Cooling System HXs to maintain isolated S/G level in band
A. CLOSE; to ensure sufficient cooling flow to the CCW HXs
Given the following conditions:
* Unit 1 has tripped due to a Loss of Offsite Power
* Instrument Air was restored in accordance with 1-EOP-99, Appendix H, Operation of the 1A and 1B Instrument Air Compressors
Subsequently:
* A Small Break LOCA occurs
* RCS Pressure is 1200 psia and STABLE
* Containment Pressure is 5.3 psig and STABLE
* Pressurizer Level is 35% and SLOWLY RISING
Which ONE of the following describes the response of the 1A and 1B Instrument Air Compressors and the reason Instrument Air is restored in the EOPs?
1A and 1B Instrument Air Compressors will STOP and must be RESET ____(1)____ to RESTORE ____(2)____.
A.
(1) locally
(2) Letdown
B.
(1) locally
(2) the ADVs
C.
(1) from the Control Room
(2) Letdown
D.
(1) from the Control Room
(2) the ADVs
B.
(1) locally
(2) the ADVs
Given the following conditions:
* BOTH Units are at 100% power
* Turnpike Line is out of service for scheduled maintenance
* Severe Weather Preparations are in progress
Subsequently:
* Midway Line 1 and Midway Line 2 are LOST
Which ONE of the following describes the required operator action(s) in accordance with 0-AOP-53.04, Reduced Offsite Transmission Capacity?
Trip ____(1)____ within a MAXIMUM of ____(2)____ minutes
A.
(1) BOTH Units
(2) 4
B.
(1) BOTH Units
(2) 15
C.
(1) selected Unit ONLY
(2) 4
D.
(1) selected Unit ONLY
(2) 15
C.
(1) selected Unit ONLY
(2) 4
Given the following conditions:
* Unit 2 tripped
* The “B” side 4.16Kv and 6.9Kv busses did not transfer to the startup transformer post trip
* The 2B EDG is supplying 2B3 4.16Kv vital bus
* 2-EOP-01, SPTAs is complete
* 2-EOP-02, Reactor Trip Recovery has been entered
Which ONE of the following describes the appropriate Pressurizer Pressure to maintain in accordance with 2-EOP-02?
Maintain Pressurizer Pressure between ________ psia.
A. 1800 and 1850
B. 1800 and 2300
C. 1850 and 2250
D. 2225 and 2275
A. 1800 and 1850
Given the following conditions:
* Unit 2 has experienced an ESDE inside containment
* 2A S/G pressure is 740 psia
* 2B S/G pressure is 850 psia
* Containment pressure is 3.1 psig
Which ONE of the following completes the statements below?
The Reactor AUTOMATICALLY tripped ON ____(1)____.
In accordance with 2-EOP-01, SPTAs, RCS Heat Removal, S/G Pressure ____(2)____ reached the value requiring manual closure of the MSIVs.
A.
(1) TM/LP
(2) HAS
B.
(1) TM/LP
(2) HAS NOT
C.
(1) Containment pressure
(2) HAS
D.
(1) Containment pressure
(2) HAS NOT
C.
(1) Containment pressure
(2) HAS
Given the following conditions:
* Unit 2 is at 20% power
* Reg Group 5 CEAs are at 101 inches withdrawn
Subsequently:
* Reg Group 5 CEA # 8 slips to 87 inches withdrawn
* The Crew has entered 2-AOP-66.01, Dropped or Misaligned CEA Abnormal Operations
* Att. 5, CEA Functional Test and Operability Determination is being performed
* The BRCO is directed to withdraw CEA # 8, Three (3) inches
Which ONE of the following completes the statements below?
Based on the current CEA position, a Control Motion Inhibit (CMI)____(1)____ be present.
IF CEA # 8 had DROPPED to the bottom of the core, for the same 3 inch rod withdrawal to test operability of the CEA, the reactivity change for the DROPPED CEA will be ____(2)____ the reactivity change for the SLIPPED CEA 3 inch CEA withdrawal.
A.
(1) will
(2) the SAME
B.
(1) will
(2) LESS THAN
C.
(1) will NOT
(2) the SAME
D.
(1) will NOT
(2) LESS THAN
B.
(1) will
(2) LESS THAN
Given the following conditions:
* Unit 2 tripped from 100% power two (2) minutes ago due to a Loss of Offsite Power
* The 2A EDG failed to start
* The 2B Charging Pump is running
* CEA 40 is stuck at 5 inches withdrawn
* 2-EOP-01, SPTAs, Step 1, VERIFY reactor trip is in progress
Which ONE of the following completes the statements below?
In accordance with 2-EOP-01, SPTAs, Emergency Boration ____(1)____ required;
____(2)____.
A.
(1) is NOT
(2) CEA portion of 2-EOP-01, Step 1 is complete
B.
(1) is
(2) Emergency Borate via the Gravity Feed valve V2508
C.
(1) is
(2) Emergency Borate via the ‘B’ Boric Acid Makeup pump to the Boron Load Control valve V2525
D.
(1) is
(2) Emergency Borate via the ‘B’ Boric Acid Makeup pump to the Emergency Borate valve V2514
B.
(1) is
(2) Emergency Borate via the Gravity Feed valve V2508
Given the following conditions:
* Unit 1 experienced a Reactor Trip due to an ESDE on the 1A S/G
* 1-EOP-01, SPTAs are in progress at Step 7.D, RCS Heat Removal, VERIFY RCS TAVG
Which ONE of the following completes the statements below?
In accordance with 1-EOP-01, Step 7.D, Emergency Boration is required when RCS TCOLD is less than ____(1)____.
In accordance Tech Spec 3.1.1.1, Shutdown Margin, the MINIMUM required boration flow rate is ____(2)____?
A.
(1) 500 °F
(2) 40 gpm
B.
(1) 500 °F
(2) 44 gpm
C.
(1) 515 °F
(2) 40 gpm
D.
(1) 515 °F
(2) 44 gpm
A.
(1) 500 °F
(2) 40 gpm
Given the following conditions:
* Unit 2 is performing a Reactor Startup in accordance with 2-GOP-302, Reactor Plant Startup – Mode 3 to Mode 2 at Step 4.5.2, Critical Approach
* 2-GOP-302, Attachment 4, Reactor Precritical Checklist has been completed
Which ONE of the following completes the statements below?
The SU Channels will AUTOMATICALLY secure at ____(1)____.
IF a SU Channel FAILS to secure at the required setpoint, the crew is required to ____(2)____ in accordance with 2-GOP-302.
A.
(1) 1 x 104 cps
(2) NOTIFY I&C to de-energize the respective startup channel
B.
(1) 1 x 104 cps
(2) PLACE the respective SU Channel High Volts Removal switch to OFF
C.
(1) 1 x 105 cps
(2) NOTIFY I&C to de-energize the respective startup channel
D.
(1) 1 x 105 cps
(2) PLACE the respective SU Channel High Volts Removal switch to OFF
B.
(1) 1 x 104 cps
(2) PLACE the respective SU Channel High Volts Removal switch to OFF
Given the following conditions:
* Unit 2 has experienced a Steam Generator Tube Leak
Which ONE of the following completes the statements below?
In accordance with TS 3.4.6.2, Reactor Coolant System Leakage, the allowed leakage limit is ____(1)____ gallons per day primary-to-secondary leakage through ____(2)____.
A.
(1) 100
(2) any ONE S/G
B.
(1) 100
(2) BOTH S/Gs combined
C.
(1) 150
(2) any ONE S/G
D.
(1) 150
(2) BOTH S/Gs combined
C.
(1) 150
(2) any ONE S/G
Given the following conditions:
* A Unit 2 spent fuel assembly has been dropped in the Fuel Handling Building
* Fuel Handling Radiation Monitors indicate on the RMCS:
SA
GAG-007 RED
GAG-009 YELLOW
GAG-011 YELLOW
SB
GAG-008 RED
GAG-010 YELLOW
GAG-012 RED
Which ONE of the following describes the status of the Fuel Handling Building
Ventilation System?
The Fuel Handling Building Normal ventilation ________.
A. remains in its normal configuration
B. ISOLATES, but the Spent Fuel Pool exhaust does NOT transfer to the Shield Building Ventilation System
C. ISOLATES, and the Spent Fuel Pool exhaust transfers to BOTH trains of the Shield Building Ventilation System
D. ISOLATES, and the Spent Fuel Pool exhaust transfers to ONLY one train of the Shield Building Ventilation System
C. ISOLATES, and the Spent Fuel Pool exhaust transfers to BOTH trains of the Shield Building Ventilation System
Which ONE of the following describes the INSTALLED firefighting capabilities for the Reactor Containment Building?
Unit 1 ____(1)____ have hose stations inside containment.
Unit 2 ____(2)____ have hose stations inside containment.
A.
(1) does
(2) does
B.
(1) does
(2) does NOT
C.
(1) does NOT
(2) does
D.
(1) does NOT
(2) does NOT
C.
(1) does NOT
(2) does
Given the following conditions:
* Unit 2 Control Room has been evacuated due to a Fire
* 2-ONP-100.02, Control Room Inaccessibility is in progress
* ALL Immediate Actions in the Control Room are complete
* RCS Pressure is 1700 psia
* RCS Tcold is 548 °F
* Pressurizer Level is 38%
Which ONE of the following describes the Unit 2 subcooling value that is required to be used in accordance with 2-ONP-100.02 and the required action in accordance with 2-ONP-100.02?
Subcooling value is ____(1)____. The Crew is required to ____(2)____ RCS Pressure.
(REFERENCE PROVIDED)
A.
(1) 15 °F
(2) RAISE
B.
(1) 15 °F
(2) MAINTAIN
C.
(1) 65 °F
(2) RAISE
D.
(1) 65 °F
(2) MAINTAIN
A.
(1) 15 °F
(2) RAISE
Given the following conditions:
* Unit 2 is performing 2-EOP-15, Functional Recovery
* RCS Pressure Control Safety Function is NOT met
* Containment Isolation Safety Function is NOT met
Which ONE of the following describes the operator that SHOULD be responsible for recovering the following Safety Functions in accordance with ADM-11.16, Transient Procedure Use and Adherence?
ADM-11.16, states that RCS Pressure Control actions should be the responsibility of the ____(1)____ RCO.
ADM-11.16, states that Containment Isolation actions should be the responsibility of the ____(2)____ RCO.
A.
(1) DESK
(2) DESK
B.
(1) DESK
(2) BOARD
C.
(1) BOARD
(2) DESK
D.
(1) BOARD
(2) BOARD
C.
(1) BOARD
(2) DESK
Given the following conditions:
* Unit 1 is in Mode 2 performing a Reactor Startup
* Critical Rod Height Data is being taken
* Reactor Power is 5 X 10-4%
* The Board RCO notes:
* RCP 1A1 amps are 160
* RCP 1A2 amps are 425
* RCP 1B1 amps are 415
* RCP 1B2 amps are 420
Which ONE of the following completes the statements below?
The Reactor ____(1)____ AUTOMATICALLY TRIP.
In accordance with ADM-11.16, Transient Procedure Use and Adherence, IF the Reactor DOES trip, the crew is required to FIRST ____(2)____.
A.
(1) will
(2) trip the RCP
B.
(1) will NOT
(2) trip the RCP
C.
(1) will
(2) VERIFY the Reactor Trip
D.
(1) will NOT
(2) VERIFY the Reactor Trip
C.
(1) will
(2) VERIFY the Reactor Trip
Which ONE of the following describes the design feature that limits the amount of Controlled Bleed Off (CBO) flow from an RCP?
CBO is limited to ____(1)____ gpm by a Flow Limiting ____(2)____.
A.
(1) 4
(2) Orifice
B.
(1) 4
(2) Check Valve
C.
(1) 10
(2) Orifice
D.
(1) 10
(2) Check Valve
D.
(1) 10
(2) Check Valve
Given the following conditions:
* Unit 2 is at 100% power
Subsequently:
* LT-2227, Volume Control Tank (VCT) Level Transmitter fails LOW
Which ONE of the following completes the statements below?
Charging Pump suction will be aligned to the ____(1)____.
LT-2227 provides VCT Level indication on ____(2)____.
A.
(1) VCT
(2) DCS ONLY
B.
(1) VCT
(2) RTGB-205 and DCS
C.
(1) Refueling Water Tank
(2) DCS ONLY
D.
(1) Refueling Water Tank
(2) RTGB-205 and DCS
C.
(1) Refueling Water Tank
(2) DCS ONLY
On Unit 2, which ONE of the following describes the interlocks associated with Shutdown Cooling (SDC) and the Hot Leg Suction Valves?
RCS Pressure must be less than a MAXIMUM of ____(1)____ psia to OPEN.
IF RCS Pressure RISES above a MINIMUM of ____(2)____ psia they will auto CLOSE.
A.
(1) 267
(2) 350
B.
(1) 267
(2) 500
C.
(1) 276
(2) 350
D.
(1) 276
(2) 500
D.
(1) 276
(2) 500
Given the following conditions:
* Unit 2 is at 100% power
* The feeder breaker to MCC-2B5 (2-40520) trips OPEN
Which ONE of the following describes the number of HPSI and LPSI Cold Leg Injection Valves that have been DE-ENERGIZED?
HPSI VALVES / LPSI VALVES
A. 1/1
B. 1/2
C. 2/1
D. 2/2
C. 2/1
Given the following conditions:
* Unit 2 is at 100% power
* The 2A CCW Essential Header has been removed from service for emergent maintenance
Which ONE of the following ECCS pumps is impacted by the 2A CCW Essential Header being removed from service?
The ____(1)____ pumps are impacted.
In accordance with 2-EOP-03, LOCA, during an emergency the HPSI Pump ____(2)____ be operated for a finite period of time.
A.
(1) CS and HPSI ONLY
(2) can
B.
(1) CS, HPSI and LPSI
(2) can
C.
(1) CS and HPSI ONLY
(2) can NOT
D.
(1) CS, HPSI and LPSI
(2) can NOT
A.
(1) CS and HPSI ONLY
(2) can
Given the following conditions:
* Unit 1 has just completed drawing a bubble from a solid plant condition
* Pressurizer pressure is 200 psia
* RCS temperature is 190°F
* A PORV is passing fluid to a downstream pressure of 1.0 psig
Which ONE of the following describes the:
(1) expected PORV tailpipe temperature AND
(2) Technical Specification Limiting Condition for Operation leakage limit for this type of leakage?
A.
(1) ~310ºF
(2) 1 gpm
B.
(1) ~310ºF
(2) 10 gpm
C.
(1) ~380ºF
(2) 1 gpm
D.
(1) ~380ºF
(2) 10 gpm
C.
(1) ~380ºF
(2) 1 gpm
Given the following conditions:
* Unit 2 has experienced a SGTR resulting in a SIAS
* The crew has directed performance of 2-EOP-99, Appendix J, Restoration of CCW and CBO to the RCPs
Which ONE of the following describes the operation of the CCW “N” Header Isolation Valves?
Restore “N” Header flow from ____(1)____ CCW train(s).
When SIAS is RESET, the “N” Header valves that were previously OPENED will ____(2)____.
A.
(1) ONE
(2) REMAIN OPEN
B.
(1) ONE
(2) AUTOMATICALLY CLOSE
C.
(1) BOTH
(2) REMAIN OPEN
D.
(1) BOTH
(2) AUTOMATICALLY CLOSE
B.
(1) ONE
(2) AUTOMATICALLY CLOSE
Given the following conditions:
* Unit 2 tripped from 100% power due to a ESDE inside containment
* 2-EOP-05, ESDE is in progress at step 28, Verify Letdown in service
* RCS Pressure is 2200 psia and being controlled by aux spray
* Pressurizer Level is 80% and slowly RISING
* Pressurizer Water Temp on TIA-1101 is 570 °F
* SIAS has been RESET per 2-EOP-99 Appendix P, Restoration of Components Actuated by ESFAS
Which ONE of the following completes the statement below?
IF letdown is established and Pressurizer Level is lowered to 65%, RCS pressure ________.
A. can be controlled at its current value by controlling aux spray
B. can be controlled at its current value by the operation of PZR heaters
C. will drop uncontrollably to < 1300 psia and SIAS will automatically actuate
D. will drop uncontrollably to < 1300 psia but SIAS will NOT automatically actuat
C. will drop uncontrollably to < 1300 psia and SIAS will automatically actuate
Given the following conditions:
* Unit 1 is at 100% power
Subsequently:
* A loss of the MA 120 VAC Instrument Bus occurs
* The Crew has just entered 1-AOP-49.02, 120V Instrument AC System (Class 1E)
Which ONE of the following failures would result in a Reactor Trip?
A. Channel B Tcold fails LOW
B. Channel D Thot fails HIGH
C. Channel C WRNI fails HIGH
D. Channel B CCW flow transmitter fails LOW
B. Channel D Thot fails HIGH
Given the following conditions:
* Unit 1 is at 100% power
* 1A Steam Generator (SG) Pressure Channel “A” has failed LOW
Subsequently:
* The 1B SG Pressure Channel “B” fails LOW
Which ONE of the following describes the expected Main Steam Isolation (MSIS) AND Reactor Protection System (RPS) response?
MSIS ____(1)____ actuate and RPS ____(2)____ trip the Reactor.
A.
(1) will
(2) will
B.
(1) will
(2) will NOT
C.
(1) will NOT
(2) will
D.
(1) will NOT
(2) will NOT
C.
(1) will NOT
(2) will
Given the following conditions:
* Unit 2 is at 100% power
* Containment Fan Coolers (CFC) B, C and D are running in FAST speed
Subsequently:
* Unit 2 trips due to a Loss of Offsite Power(LOOP)
* The 2A CCW Pump trips upon bus being energized from the 2A EDG
Which ONE of the following describes the status of the CFCs and their cooling water flow?
ALL CFCs are running in ____(1)____ speed AND ONLY the ____(2)____ CFCs have CCW flow.
A.
(1) SLOW
(2) B and D
B.
(1) FAST
(2) B and D
C.
(1) SLOW
(2) C and D
D.
(1) FAST
(2) C and D
D.
(1) FAST
(2) C and D
Given the following conditions:
* Unit 2 is at 100% power
* HVE-21A, CEDM Cooling Fan is running
* Containment Air Temperature is 92 °F
Subsequently:
* Annunciator X-8, CEDM COOLING HVE-21A FLOW LOW/OVRLD/TRIP alarms
* HVE-21A Ammeter indicates 0 amps
Which ONE of the following describes the response of HVE-21B, CEDM Cooling Fan and the operational requirements?
HVE-21B ____(1)____ AUTOMATICALLY start.
IF CEDM Fan Cooling is NOT restored within 45 minutes of being lost, a ____(2)____ is required in accordance with 2-AOP-25.01, Loss of RCB Cooling Fans.
A.
(1) will
(2) Reactor Trip
B.
(1) will
(2) Normal Shutdown
C.
(1) will NOT
(2) Reactor Trip
D.
(1) will NOT
(2) Normal Shutdown
A.
(1) will
(2) Reactor Trip