Q
What can be used to simultaneously improve quality and allow for schedule compression, saving time and money? Clue: Think steel frames
A
- Use modular construction
- Structural components assembled off site
- Allows for better observations to be made during assembly improving quality
- This simultaneously allows for fast tracking to also be performed to the schedule, overlapping activities which traditionally would not be overlapped saving time and money.
2
Q
What is an example of how stakeholders metrics of quality varies?
A
- Think about a C30/37 in-situ concrete column
- The client may be satisfied if the ASTM C109 cube compressive strength test for each batch is greater than the minimum 37 N/mm^2 strength.
- However, during operation, building users may not be satisfied that the concrete is strong enough unless aesthetically it looks perfect. Therefore high quality finishing may be a priority.
3
Q
What is a superb way of integrating all stakeholders early in the project?
A
- Integrated project delivery (IPD)
- Collaborating with all stakeholders early and promotes collective responsibility for quality
4
Q
Why is looking at what drives primary stakeholders in the project important in managing quality and why does this reveal a possible conflict of interest?
Clue: Contractor vs Client
A
- Both the contractor and client want return on investment
- The client can attain this by a project finished on time and budget to quality
- However the contractor may want to try and boost profits by taking shortcuts in construction
- There is a conflict of interest
- Implementing quality based bonuses could solve this possible issue
5
Q
What is a critical public view on how ‘high quality’ projects are nowadays? Clue: Global warming
A
- Enhancing sustainability practices
- Enhances stakeholder satisfaction and project reputation
6
Q
What can be combined with modular construction to enhance quality further?
A
- Prefabrication techniques (manufacturing components offsite)
- Combine prefabrication and modular construction!